Hackspace Move/Electronics: Difference between revisions
From London Hackspace Wiki
No edit summary |
|||
Line 1: | Line 1: | ||
== Dependencies == | |||
* Ventilation (Paddy, Steve, Charles) | |||
** Mild HCL fumes likely, filter must be able to deal with these | |||
* Drainage (none!) - Normal requirements HCL not strong enough to warrant special treatment | |||
* Power (alisonw) | |||
* Comms (Jasper/tgreer) - Running water supply | |||
== Electronics stations == | == Electronics stations == | ||
Revision as of 21:31, 25 March 2013
Dependencies
- Ventilation (Paddy, Steve, Charles)
- Mild HCL fumes likely, filter must be able to deal with these
- Drainage (none!) - Normal requirements HCL not strong enough to warrant special treatment
- Power (alisonw)
- Comms (Jasper/tgreer) - Running water supply
Electronics stations
Responsible: mentar
The plan is to have 2 soldering and 1 test bench upstairs
Etching station
The etch tank needs ventilation, running water and drainage, hence the plan is to locate it downstairs between the biolab and the lift shaft.