Revision as of 21:31, 25 March 2013
Responsible: mentar
Dependencies
- Ventilation (Paddy, Steve, Charles)
- Mild HCL fumes likely, filter must be able to deal with these
- Drainage (none!) - Normal requirements HCL not strong enough to warrant special treatment
- Power (alisonw)
- Comms (Jasper/tgreer) - Running water supply
Electronics stations
The plan is to have 2 soldering and 1 test bench upstairs
Etching station
The etch tank needs ventilation, running water and drainage, hence the plan is to locate it downstairs between the biolab and the lift shaft.