Hackspace Move/Electronics: Difference between revisions

From London Hackspace Wiki
No edit summary
No edit summary
Line 1: Line 1:
Responsible: [[user:mentar|mentar]]
== Dependencies ==
== Dependencies ==


Line 8: Line 10:


== Electronics stations ==
== Electronics stations ==
Responsible: [[user:mentar|mentar]]


The plan is to have 2 soldering and 1 test bench upstairs
The plan is to have 2 soldering and 1 test bench upstairs

Revision as of 21:31, 25 March 2013

Responsible: mentar

Dependencies

  • Ventilation (Paddy, Steve, Charles)
    • Mild HCL fumes likely, filter must be able to deal with these
  • Drainage (none!) - Normal requirements HCL not strong enough to warrant special treatment
  • Power (alisonw)
  • Comms (Jasper/tgreer) - Running water supply

Electronics stations

The plan is to have 2 soldering and 1 test bench upstairs


Etching station

The etch tank needs ventilation, running water and drainage, hence the plan is to locate it downstairs between the biolab and the lift shaft.