Hackspace Move/Planning/2013-04-08: Difference between revisions

From London Hackspace Wiki

no edit summary
No edit summary
No edit summary
Line 3: Line 3:
The basement floor was lifted
The basement floor was lifted


[[File:20130329_181326.jpg|200px]]
[[File:20130329_181326.jpg|400px]]


The drywall erected upstairs
The drywall erected upstairs


[[File:20130329_163135.jpg|200px]]
[[File:20130329_163135.jpg|400px]]


And boxes for sockets installed
And boxes for sockets installed


[[File:20130407_200350.jpg|200px]]
[[File:20130407_200350.jpg|400px]]


And started downstairs
And started downstairs


[[File:20130329_163356.jpg|200px]]
[[File:20130329_163356.jpg|400px]]


Upstairs was rockwalled
Upstairs was rockwalled


[[File:20130329_163844.jpg|200px]]
[[File:20130329_163844.jpg|400px]]


And downstairs
And downstairs


[[File:20130329_163255.jpg|200px]]
[[File:20130329_163255.jpg|400px]]


Run network cabling for the ground floor
Run network cabling for the ground floor


[[File:20130329_181051.jpg|200px]]
[[File:20130329_181051.jpg|400px]]


Got the lift functional, although we still don't have insurance, so please don't use it for travelling in
Got the lift functional, although we still don't have insurance, so please don't use it for travelling in


[[File:20130406_171659.jpg|200px]]
[[File:20130406_171659.jpg|400px]]


Taken one asbestos-based tile down and put it in the storage room by the main door. Please don't touch it - if you do, contact the trustees.
Taken one asbestos-based tile down and put it in the storage room by the main door. Please don't touch it - if you do, contact the trustees.


[[File:20130406_173357.jpg|200px]]
[[File:20130406_173357.jpg|400px]]


Covered the fire exit to prevent heat escaping. This will be modified again shortly as it's probably intended to be a smoke vent in case of fire.
Covered the fire exit to prevent heat escaping. This will be modified again shortly as it's probably intended to be a smoke vent in case of fire.


[[File:20130406_172453.jpg|200px]]
[[File:20130406_172453.jpg|400px]]




Line 45: Line 45:
Filled the gaps
Filled the gaps


[[File:20130406_172232.jpg|200px]]
[[File:20130406_172232.jpg|400px]]


Prepared the concrete
Prepared the concrete


[[File:20130406_172603.jpg|200px]]
[[File:20130406_172603.jpg|400px]]


To paint the floor
To paint the floor


[[File:20130406_173517.jpg|200px]]
[[File:20130406_173517.jpg|400px]]


Finished product. There are some cracks near the lift that still need filling
Finished product. There are some cracks near the lift that still need filling


[[File:20130406_220148.jpg|200px]]
[[File:20130406_220148.jpg|400px]]


Removed the chalky paint from the floor of the metal workshop, which will be painted on Monday/Tuesday evening
Removed the chalky paint from the floor of the metal workshop, which will be painted on Monday/Tuesday evening


[[File:20130407_190606.jpg|200px]]
[[File:20130407_190606.jpg|400px]]


Biohackers are filling gaps for their lab, and will be painting during the week
Biohackers are filling gaps for their lab, and will be painting during the week


[[File:20130407_190424.jpg|200px]]
[[File:20130407_190424.jpg|400px]]
3,313

edits