The basement floor was lifted | The basement floor was lifted | ||
[[File:20130329_181326.jpg| | [[File:20130329_181326.jpg|400px]] | ||
The drywall erected upstairs | The drywall erected upstairs | ||
[[File:20130329_163135.jpg| | [[File:20130329_163135.jpg|400px]] | ||
And boxes for sockets installed | And boxes for sockets installed | ||
[[File:20130407_200350.jpg| | [[File:20130407_200350.jpg|400px]] | ||
And started downstairs | And started downstairs | ||
[[File:20130329_163356.jpg| | [[File:20130329_163356.jpg|400px]] | ||
Upstairs was rockwalled | Upstairs was rockwalled | ||
[[File:20130329_163844.jpg| | [[File:20130329_163844.jpg|400px]] | ||
And downstairs | And downstairs | ||
[[File:20130329_163255.jpg| | [[File:20130329_163255.jpg|400px]] | ||
Run network cabling for the ground floor | Run network cabling for the ground floor | ||
[[File:20130329_181051.jpg| | [[File:20130329_181051.jpg|400px]] | ||
Got the lift functional, although we still don't have insurance, so please don't use it for travelling in | Got the lift functional, although we still don't have insurance, so please don't use it for travelling in | ||
[[File:20130406_171659.jpg| | [[File:20130406_171659.jpg|400px]] | ||
Taken one asbestos-based tile down and put it in the storage room by the main door. Please don't touch it - if you do, contact the trustees. | Taken one asbestos-based tile down and put it in the storage room by the main door. Please don't touch it - if you do, contact the trustees. | ||
[[File:20130406_173357.jpg| | [[File:20130406_173357.jpg|400px]] | ||
Covered the fire exit to prevent heat escaping. This will be modified again shortly as it's probably intended to be a smoke vent in case of fire. | Covered the fire exit to prevent heat escaping. This will be modified again shortly as it's probably intended to be a smoke vent in case of fire. | ||
[[File:20130406_172453.jpg| | [[File:20130406_172453.jpg|400px]] | ||
Line 45: | Line 45: | ||
Filled the gaps | Filled the gaps | ||
[[File:20130406_172232.jpg| | [[File:20130406_172232.jpg|400px]] | ||
Prepared the concrete | Prepared the concrete | ||
[[File:20130406_172603.jpg| | [[File:20130406_172603.jpg|400px]] | ||
To paint the floor | To paint the floor | ||
[[File:20130406_173517.jpg| | [[File:20130406_173517.jpg|400px]] | ||
Finished product. There are some cracks near the lift that still need filling | Finished product. There are some cracks near the lift that still need filling | ||
[[File:20130406_220148.jpg| | [[File:20130406_220148.jpg|400px]] | ||
Removed the chalky paint from the floor of the metal workshop, which will be painted on Monday/Tuesday evening | Removed the chalky paint from the floor of the metal workshop, which will be painted on Monday/Tuesday evening | ||
[[File:20130407_190606.jpg| | [[File:20130407_190606.jpg|400px]] | ||
Biohackers are filling gaps for their lab, and will be painting during the week | Biohackers are filling gaps for their lab, and will be painting during the week | ||
[[File:20130407_190424.jpg| | [[File:20130407_190424.jpg|400px]] |