The basement floor was lifted | The basement floor was lifted | ||
[[File:20130329_181326.jpg| | [[File:20130329_181326.jpg|400px]] | ||
The drywall erected upstairs | The drywall erected upstairs | ||
[[File:20130329_163135.jpg| | [[File:20130329_163135.jpg|400px]] | ||
And boxes for sockets installed | And boxes for sockets installed | ||
[[File:20130407_200350.jpg| | [[File:20130407_200350.jpg|400px]] | ||
And started downstairs | And started downstairs | ||
[[File:20130329_163356.jpg| | [[File:20130329_163356.jpg|400px]] | ||
Upstairs was rockwalled | Upstairs was rockwalled | ||
[[File:20130329_163844.jpg| | [[File:20130329_163844.jpg|400px]] | ||
And downstairs | And downstairs | ||
[[File:20130329_163255.jpg| | [[File:20130329_163255.jpg|400px]] | ||
Run network cabling for the ground floor | Run network cabling for the ground floor | ||
[[File:20130329_181051.jpg| | [[File:20130329_181051.jpg|400px]] | ||
Got the lift functional, although we still don't have insurance, so please don't use it for travelling in | Got the lift functional, although we still don't have insurance, so please don't use it for travelling in | ||
[[File:20130406_171659.jpg| | [[File:20130406_171659.jpg|400px]] | ||
Taken one asbestos-based tile down and put it in the storage room by the main door. Please don't touch it - if you do, contact the trustees. | Taken one asbestos-based tile down and put it in the storage room by the main door. Please don't touch it - if you do, contact the trustees. | ||
[[File:20130406_173357.jpg| | [[File:20130406_173357.jpg|400px]] | ||
Covered the fire exit to prevent heat escaping. This will be modified again shortly as it's probably intended to be a smoke vent in case of fire. | Covered the fire exit to prevent heat escaping. This will be modified again shortly as it's probably intended to be a smoke vent in case of fire. | ||
[[File:20130406_172453.jpg| | [[File:20130406_172453.jpg|400px]] | ||
Line 45: | Line 45: | ||
Filled the gaps | Filled the gaps | ||
[[File:20130406_172232.jpg| | [[File:20130406_172232.jpg|400px]] | ||
Prepared the concrete | Prepared the concrete | ||
[[File:20130406_172603.jpg| | [[File:20130406_172603.jpg|400px]] | ||
To paint the floor | To paint the floor | ||
[[File:20130406_173517.jpg| | [[File:20130406_173517.jpg|400px]] | ||
Finished product. There are some cracks near the lift that still need filling | Finished product. There are some cracks near the lift that still need filling | ||
[[File:20130406_220148.jpg| | [[File:20130406_220148.jpg|400px]] | ||
Removed the chalky paint from the floor of the metal workshop, which will be painted on Monday/Tuesday evening | Removed the chalky paint from the floor of the metal workshop, which will be painted on Monday/Tuesday evening | ||
[[File:20130407_190606.jpg| | [[File:20130407_190606.jpg|400px]] | ||
Biohackers are filling gaps for their lab, and will be painting during the week | Biohackers are filling gaps for their lab, and will be painting during the week | ||
[[File:20130407_190424.jpg| | [[File:20130407_190424.jpg|400px]] |
Revision as of 13:04, 8 April 2013
Last week
The basement floor was lifted
The drywall erected upstairs
And boxes for sockets installed
And started downstairs
Upstairs was rockwalled
And downstairs
Run network cabling for the ground floor
Got the lift functional, although we still don't have insurance, so please don't use it for travelling in
Taken one asbestos-based tile down and put it in the storage room by the main door. Please don't touch it - if you do, contact the trustees.
Covered the fire exit to prevent heat escaping. This will be modified again shortly as it's probably intended to be a smoke vent in case of fire.
This weekend
Filled the gaps
Prepared the concrete
To paint the floor
Finished product. There are some cracks near the lift that still need filling
Removed the chalky paint from the floor of the metal workshop, which will be painted on Monday/Tuesday evening
Biohackers are filling gaps for their lab, and will be painting during the week