Hackspace Move/Planning/2013-04-08: Difference between revisions

From London Hackspace Wiki
No edit summary
No edit summary
Line 3: Line 3:
The basement floor was lifted
The basement floor was lifted


[[File:20130329_181326.jpg|200px]]
[[File:20130329_181326.jpg|400px]]


The drywall erected upstairs
The drywall erected upstairs


[[File:20130329_163135.jpg|200px]]
[[File:20130329_163135.jpg|400px]]


And boxes for sockets installed
And boxes for sockets installed


[[File:20130407_200350.jpg|200px]]
[[File:20130407_200350.jpg|400px]]


And started downstairs
And started downstairs


[[File:20130329_163356.jpg|200px]]
[[File:20130329_163356.jpg|400px]]


Upstairs was rockwalled
Upstairs was rockwalled


[[File:20130329_163844.jpg|200px]]
[[File:20130329_163844.jpg|400px]]


And downstairs
And downstairs


[[File:20130329_163255.jpg|200px]]
[[File:20130329_163255.jpg|400px]]


Run network cabling for the ground floor
Run network cabling for the ground floor


[[File:20130329_181051.jpg|200px]]
[[File:20130329_181051.jpg|400px]]


Got the lift functional, although we still don't have insurance, so please don't use it for travelling in
Got the lift functional, although we still don't have insurance, so please don't use it for travelling in


[[File:20130406_171659.jpg|200px]]
[[File:20130406_171659.jpg|400px]]


Taken one asbestos-based tile down and put it in the storage room by the main door. Please don't touch it - if you do, contact the trustees.
Taken one asbestos-based tile down and put it in the storage room by the main door. Please don't touch it - if you do, contact the trustees.


[[File:20130406_173357.jpg|200px]]
[[File:20130406_173357.jpg|400px]]


Covered the fire exit to prevent heat escaping. This will be modified again shortly as it's probably intended to be a smoke vent in case of fire.
Covered the fire exit to prevent heat escaping. This will be modified again shortly as it's probably intended to be a smoke vent in case of fire.


[[File:20130406_172453.jpg|200px]]
[[File:20130406_172453.jpg|400px]]




Line 45: Line 45:
Filled the gaps
Filled the gaps


[[File:20130406_172232.jpg|200px]]
[[File:20130406_172232.jpg|400px]]


Prepared the concrete
Prepared the concrete


[[File:20130406_172603.jpg|200px]]
[[File:20130406_172603.jpg|400px]]


To paint the floor
To paint the floor


[[File:20130406_173517.jpg|200px]]
[[File:20130406_173517.jpg|400px]]


Finished product. There are some cracks near the lift that still need filling
Finished product. There are some cracks near the lift that still need filling


[[File:20130406_220148.jpg|200px]]
[[File:20130406_220148.jpg|400px]]


Removed the chalky paint from the floor of the metal workshop, which will be painted on Monday/Tuesday evening
Removed the chalky paint from the floor of the metal workshop, which will be painted on Monday/Tuesday evening


[[File:20130407_190606.jpg|200px]]
[[File:20130407_190606.jpg|400px]]


Biohackers are filling gaps for their lab, and will be painting during the week
Biohackers are filling gaps for their lab, and will be painting during the week


[[File:20130407_190424.jpg|200px]]
[[File:20130407_190424.jpg|400px]]

Revision as of 13:04, 8 April 2013

Last week

The basement floor was lifted

20130329 181326.jpg

The drywall erected upstairs

20130329 163135.jpg

And boxes for sockets installed

20130407 200350.jpg

And started downstairs

20130329 163356.jpg

Upstairs was rockwalled

20130329 163844.jpg

And downstairs

20130329 163255.jpg

Run network cabling for the ground floor

20130329 181051.jpg

Got the lift functional, although we still don't have insurance, so please don't use it for travelling in

20130406 171659.jpg

Taken one asbestos-based tile down and put it in the storage room by the main door. Please don't touch it - if you do, contact the trustees.

20130406 173357.jpg

Covered the fire exit to prevent heat escaping. This will be modified again shortly as it's probably intended to be a smoke vent in case of fire.

20130406 172453.jpg


This weekend

Filled the gaps

20130406 172232.jpg

Prepared the concrete

20130406 172603.jpg

To paint the floor

20130406 173517.jpg

Finished product. There are some cracks near the lift that still need filling

20130406 220148.jpg

Removed the chalky paint from the floor of the metal workshop, which will be painted on Monday/Tuesday evening

20130407 190606.jpg

Biohackers are filling gaps for their lab, and will be painting during the week

20130407 190424.jpg