|
|
(19 intermediate revisions by 8 users not shown) |
Line 1: |
Line 1: |
| This page is for planning the build out of our new space, currently centred on 445 Hackney Road. | | This page had suffered from mission creep and became out of date, so has been removed. |
|
| |
|
| Please note, this is for planning on bringing up a new space to the level we currently enjoy, not wild new awesome things. (that can come after) This is so that we have a action and cost plan to maintain the level of our current space.
| | [[Category:Moving_Space]] |
| | |
| ==Basement==
| |
| * Extraction for individual tools and room dust.
| |
| * Power distribution to the center of the room etc
| |
| * Moar network sockets around room ([[Project:Tool_Access_Control/Solexious_Proposal|ACnode]])
| |
| * Look at flooring situation
| |
| | |
| ==Ground Floor==
| |
| * Moar network
| |
| * Mid room power
| |
| * Kitchen build out
| |
| * Electric release on the rear door
| |
| * Building of classroom
| |
| * Draft proof louver windows
| |
| | |
| ==Car Park==
| |
| * Member access for car parking and bike storage
| |
| | |
| ==Facilities==
| |
| | |
| ==Total Costing==
| |
| | |
| The above will cost approximately - £xxx
| |
Latest revision as of 20:56, 20 May 2013
This page had suffered from mission creep and became out of date, so has been removed.