Pledge: Basement plumbing: Difference between revisions
From London Hackspace Wiki
mNo edit summary |
No edit summary |
||
Line 6: | Line 6: | ||
==The items== | ==The items== | ||
* A pump to push waste water upstairs to main drain pipe. Inflow and drainage pipes. | * A pump to push waste water upstairs to main drain pipe. | ||
* Inflow and drainage pipes. | |||
==We should then have== | |||
* Sink in the main workshop area with HOT WATER! | |||
* 1 Sink in PCB/darkroom area | |||
* working PCB etching tank | |||
* Sink in the Biolab | |||
===Budget estimation=== | ===Budget estimation=== | ||
* £800. £590 for pump, rest on pipes. | * £800. (£590 for pump, rest on pipes. ) | ||
==Pledges== | ==Pledges== |
Revision as of 18:12, 30 September 2013
Installation of running water and drainage (with pump) for the basement. Pledge opened: 29 jul 2013
Pledge leader: Will
The items
- A pump to push waste water upstairs to main drain pipe.
- Inflow and drainage pipes.
We should then have
- Sink in the main workshop area with HOT WATER!
- 1 Sink in PCB/darkroom area
- working PCB etching tank
- Sink in the Biolab
Budget estimation
- £800. (£590 for pump, rest on pipes. )
Pledges
- £400 -- Biohackers
- £50 - Tom Hodder
Running total: £450
Target: £350