Difference between revisions of "CNC Robotics area"
Jump to navigation
Jump to search
m (→Clean-up) |
(Area clearout update) |
||
Line 2: | Line 2: | ||
== TODO == | == TODO == | ||
− | * Clean from the rubbish/junk | + | * <s>Clean from the rubbish/junk</s> |
* Install staubli semi-permamently | * Install staubli semi-permamently | ||
− | ** Draw up the current proposals | + | ** <s>Draw up the current proposals</s> |
− | ** Agree on placement/safety | + | ** <s>Agree on placement/safety<s/> |
** Make! | ** Make! | ||
== Clean-up == | == Clean-up == | ||
− | [[File: | + | [[File:CNC_Robotics_area_before_cleanup.jpg|thumb|Before clean]] |
+ | [[File:CNC_Robotics_area_after_cleanup.jpg|thumb|After clean]] | ||
* networking cabled -> gimp closet | * networking cabled -> gimp closet | ||
− | * 5kW, 3ph fans | + | * 5kW, 3ph fans -> skip |
− | * table legs -> | + | * A mix of heavy duty electric switches -> boiler room |
+ | * table legs -> out of the way | ||
* floor laminate sheets -> skip | * floor laminate sheets -> skip | ||
Revision as of 12:07, 12 February 2014
Located in the far end of the basement, aimed primarily for robotics projects and CNC machinery
TODO
Clean from the rubbish/junk- Install staubli semi-permamently
Draw up the current proposalsAgree on placement/safety- Make!
Clean-up
- networking cabled -> gimp closet
- 5kW, 3ph fans -> skip
- A mix of heavy duty electric switches -> boiler room
- table legs -> out of the way
- floor laminate sheets -> skip