* Description: ...
* Description: ...
* Status: carpet is there, fittings have been ordered
* Status:Carpet down
* People: Robert, Adrian, Phil
* People: Robert, Adrian, Phil
* Schedule: Potentially any time after the fittings arrive, but space cleaning day (especially the evening) looks the best prospect at the moment
* Schedule: Monitor for adhesion problems....


=== Kitchen Flooring ===
=== Kitchen Flooring ===


* Description: ...
* Description: ...
* Status: need to put down a screed, needs to be ordered/bought. Then use the vinyl we have or buy resin paint. This requires financial assessment first.
* Status: Floor done
* People: ?
* People: ?


Line 37: Line 37:


* Description: [[Darkroom]]
* Description: [[Darkroom]]
* Status: started building some work surfaces  
* Status: started building some work surfaces, Supports part finished.
* People: Phil, AlexP
* People: Phil, AlexP


Line 43: Line 43:


* Description: ...
* Description: ...
* Status: needs removal. Auction off?
* Status: Dismantled and removed from Wet Lab.
* People: ?
* People: ?


Line 49: Line 49:


* Description: ...
* Description: ...
* Status: need to remove furnace, sweep it
* Status: Clean and tidy, Flushes OK
* People: ?
* People: ?


Line 63: Line 63:


* Description: replace existing projector with the NEC projector, mount it properly
* Description: replace existing projector with the NEC projector, mount it properly
* Status:  
* Status: New mounting part built, to replace a ceiling tile.
* People: ?
* People: Phil


=== Reorganise use of Unit 23 Space ===
=== Reorganise use of Unit 23 Space ===
Line 93: Line 93:


* Description: to label unmarked objects that you want to nominate for removal. Cf Phil's "Do Not Hack" stickers.
* Description: to label unmarked objects that you want to nominate for removal. Cf Phil's "Do Not Hack" stickers.
* Status:  
* Status: HACK ME Stickers now available with space for "Dispose by" date
* People: ?
* People: ?



Revision as of 01:25, 26 August 2011

This documents efforts at improving the layout and infrastructure at the space.

Ongoing projects

Quiet Room carpet

  • Description: ...
  • Status:Carpet down
  • People: Robert, Adrian, Phil
  • Schedule: Monitor for adhesion problems....

Kitchen Flooring

  • Description: ...
  • Status: Floor done
  • People: ?

Kitchen Plumbing

  • Description: ...
  • Status: hot water generator needs to be moved from unit 23, cold water pipe run to the kitchen, and waste water out.
  • People: ?

Kitchen Wiring

  • Description: wiring for oven and hob. Needs to be certified by an electrician.
  • Status:
  • People: Russ

Kitchen Units

  • Description: ...
  • Status: materials all there, need fitting in place once floor, wiring, plumbing are done.
  • People: Phil

Wetlab/Darkroom

  • Description: Darkroom
  • Status: started building some work surfaces, Supports part finished.
  • People: Phil, AlexP

Lab "Extractor" Bench

  • Description: ...
  • Status: Dismantled and removed from Wet Lab.
  • People: ?

Unit 23 Toilet

  • Description: ...
  • Status: Clean and tidy, Flushes OK
  • People: ?

Quiet Room Screen

  • Description: for projections
  • Status: need to obtain epoxy bolts, then put up screen
  • People: Adrian (?)
  • Proposal : drill and epoxy bolts into ceiling near window. Drill auxiliary fixings to hold bolts in place while epoxy sets. After setting, perform pull test on bolts. Schedule team of helpers to lift screen into place and fix. These activities will create some dust, mess and brief disruption in the quiet room.
  • Requirements : epoxy capsules (I have some of these, possibly date-expired - artag), studding, large masonry drill bit, heavy duty power drill. I also have the latter 2, but can't bring them to the space cleaning day. It may be possible to do the drilling phase before that date.

Quiet Room Projector

  • Description: replace existing projector with the NEC projector, mount it properly
  • Status: New mounting part built, to replace a ceiling tile.
  • People: Phil

Reorganise use of Unit 23 Space

  • Description: optimise storage areas etc
  • Status: start with Space_Organising_Day and use as opportunity to assess the layout
  • People: ?

Box in Lasercutter extraction

  • Description: ...
  • Status: ?
  • People: Billy (?)

Tool Access Control

Wiring Burglar Alarm Sensors

  • Description: ... so we can monitor them, implement reminders ("close the back doors") etc
  • Status:
  • People: ?

Create "Time To Live" Stickers

  • Description: to label unmarked objects that you want to nominate for removal. Cf Phil's "Do Not Hack" stickers.
  • Status: HACK ME Stickers now available with space for "Dispose by" date
  • People: ?

Meetings

See Infrastructure meeting