Hackspace Move/Cremer Restoration: Difference between revisions

From London Hackspace Wiki
No edit summary
Line 10: Line 10:
* Remove internal walls and false ceiling
* Remove internal walls and false ceiling
* Remove waste pipe to 23
* Remove waste pipe to 23
* Remove plastic strips
* <s>Remove plastic strips</s>
* Repair holes in front door
* Repair holes in front door



Revision as of 17:51, 13 April 2013

This is a list of things that need to be fixed or restored once we leave Cremer st. Please add anything you can think of, they will be struck off once we have confirmation that the work doesn't need to be done, or is completed.

Unit 24

  • Restore connecting wall to 23 -- do we have brick for this (and unit 23 loo partition)?
  • Restore kitchen
  • Replace ceiling tiles
  • Paint all walls white in main rooms
  • Paint all walls white in toilets
  • Paint toilet doors black
  • Remove internal walls and false ceiling
  • Remove waste pipe to 23
  • Remove plastic strips
  • Repair holes in front door

Unit 23

  • Fix holes in back door
  • Restore partition in loo and replace any loos or basins that have been removed
  • Fit new glass where extraction for lasercutter is currently
  • Fill in hole where the duct comes through the wall from the workshop.
  • Paint all walls back to white

Outside

  • Sweep balconies for any items