Line 8: | Line 8: | ||
* Status: carpet is there, fittings have been ordered | * Status: carpet is there, fittings have been ordered | ||
* People: Robert, Adrian, Phil | * People: Robert, Adrian, Phil | ||
* Schedule: Potentially any time after the fittings arrive, but space cleaning day (especially the evening) looks the best prospect at the moment | |||
=== Kitchen Flooring === | === Kitchen Flooring === |
Revision as of 11:29, 29 June 2011
This documents efforts at improving the layout and infrastructure at the space.
Ongoing projects
Quiet Room carpet
- Description: ...
- Status: carpet is there, fittings have been ordered
- People: Robert, Adrian, Phil
- Schedule: Potentially any time after the fittings arrive, but space cleaning day (especially the evening) looks the best prospect at the moment
Kitchen Flooring
- Description: ...
- Status: need to put down a screed, needs to be ordered/bought. Then use the vinyl we have or buy resin paint. This requires financial assessment first.
- People: ?
Kitchen Plumbing
- Description: ...
- Status: hot water generator needs to be moved from unit 23, cold water pipe run to the kitchen, and waste water out.
- People: ?
Kitchen Wiring
- Description: wiring for oven and hob. Needs to be certified by an electrician.
- Status:
- People: Russ
Kitchen Units
- Description: ...
- Status: materials all there, need fitting in place once floor, wiring, plumbing are done.
- People: Phil
Wetlab/Darkroom
- Description: Darkroom
- Status: started building some work surfaces
- People: Phil, AlexP
Lab "Extractor" Bench
- Description: ...
- Status: needs removal. Auction off?
- People: ?
Unit 23 Toilet
- Description: ...
- Status: need to remove furnace, sweep it
- People: ?
Quiet Room Screen
- Description: for projections
- Status: need to obtain epoxy bolts, then put up screen
- People: Adrian (?)
Quiet Room Projector
- Description: replace existing projector with the NEC projector, mount it properly
- Status:
- People: ?
Reorganise use of Unit 23 Space
- Description: optimise storage areas etc
- Status: start with Space_Organising_Day and use as opportunity to assess the layout
- People: ?
Box in Lasercutter extraction
- Description: ...
- Status: ?
- People: Billy (?)
Tool Access Control
- Description: Projects/Tool_Access_Control
- Status: someone needs to implement this
- People: ?
Wiring Burglar Alarm Sensors
- Description: ... so we can monitor them, implement reminders ("close the back doors") etc
- Status:
- People: ?
Create "Time To Live" Stickers
- Description: to label unmarked objects that you want to nominate for removal. Cf Phil's "Do Not Hack" stickers.
- Status:
- People: ?