Cremer st - Infrastructure/Kitchen Wiring: Difference between revisions
From London Hackspace Wiki
No edit summary |
mNo edit summary |
||
Line 21: | Line 21: | ||
|} | |} | ||
Upgrade | Upgrade diameters (4-6, 16-25) if not clipped to a masonry or wooden wall. | ||
=== Suggested suppliers=== | === Suggested suppliers=== |
Revision as of 23:47, 15 February 2012
People: Paddyd, Phil, Russ
We have sockets and 2.5mm cable aplenty.
Planned
- Distro box: 3x32A breakers, 1x16A breaker
- Cables:
Purpose | Power | Diameter | Length |
---|---|---|---|
Distro | 100A | 16mm | >>1m+14m+4m = 20m |
Oven | 5kW (>>22A) | 4mm | >>2m+2m = 5m |
Hob | 6kW/6.6kW (>>29A) | 4mm | >>2m+2m = 5m |
Water heater | guess 3kW (13A) | 2.5mm | >>2m = 3m |
Ring main | 2.5mm | >>2m+2.5m+2.5m, 2m+2m = 12m |
Upgrade diameters (4-6, 16-25) if not clipped to a masonry or wooden wall.
Suggested suppliers
- TLC-direct (cheap, but whole drum)
- ?
Back-up option
- 2x4mm runs, one for hob, one for oven
- Put boiler on a fused spur or do a separate 2.5/4mm run for that.