This is a list of things that need to be fixed or restored once we leave Cremer st. Please add anything you can think of, they will be <s>struck off</s> once we have confirmation that the work doesn't need to be done, or is completed.
This is a list of things that need to be fixed or restored once we leave Cremer st. Please add anything you can think of, they will be <s>struck off</s> once we have confirmation that the work doesn't need to be done, or is completed.


Tasks marked with "++" are definitely needed, all others are to be confirmed.
Supplies needed: brick/blocks for repairing the hole between 24, black and white paint.
 
== Toilets ==
* Paint all walls white in toilets.
* Paint toilet doors black.
* Restore partition in loo and replace any loos or basins that have been removed (mainly in the biolab/darkroom).


==Unit 24==
==Unit 24==
* Paint all walls white in toilets ++
* Repair holes in front door/remove camera from spy hole and outside door.
* Paint toilet doors black ++
* Repair holes in front door/remove camera from spy hole and outside door ++
* Restore connecting wall to 23 -- do we have brick for this (and unit 23 loo partition)?
* Restore connecting wall to 23 -- do we have brick for this (and unit 23 loo partition)?
* Restore kitchen - replace sink in original location, which was under the laptop bar: on the right as you walk into the main room of 24.
* Replace kitchen sink in original location, which was under the laptop bar: on the right as you walk into the main room of 24.
* Remove waste pipe to 23
* Remove everything else in kitchen.
* <s>Remove plastic strips</s>
* Remove waste pipe to 23.
* Collect decorative electrical panels - one by front door, possibly one by kitchen door
* Wash concrete block walls, and any that still look crappy, repaint.
* Collect decorative electrical panels - one by front door, possibly one by kitchen door.


==Unit 23==
==Unit 23==
* Fix holes in back door ++
* Fix holes in back door.
* Fit new glass where extraction for lasercutter is currently ++
* Fit new glass where extraction for lasercutter is currently.
* Fill in hole where the duct comes through the wall from the workshop.++
* Fill in hole where the duct comes through the wall from the workshop.
* Paint all walls back to white ++
* Wash concrete block walls, and any that still look crappy, repaint.
* Restore partition in loo and replace any loos or basins that have been removed


==Outside==
==Outside==
* Sweep balconies for any items ++
* Sweep balconies for any items.

Revision as of 15:00, 15 April 2013

This is a list of things that need to be fixed or restored once we leave Cremer st. Please add anything you can think of, they will be struck off once we have confirmation that the work doesn't need to be done, or is completed.

Supplies needed: brick/blocks for repairing the hole between 24, black and white paint.

Toilets

  • Paint all walls white in toilets.
  • Paint toilet doors black.
  • Restore partition in loo and replace any loos or basins that have been removed (mainly in the biolab/darkroom).

Unit 24

  • Repair holes in front door/remove camera from spy hole and outside door.
  • Restore connecting wall to 23 -- do we have brick for this (and unit 23 loo partition)?
  • Replace kitchen sink in original location, which was under the laptop bar: on the right as you walk into the main room of 24.
  • Remove everything else in kitchen.
  • Remove waste pipe to 23.
  • Wash concrete block walls, and any that still look crappy, repaint.
  • Collect decorative electrical panels - one by front door, possibly one by kitchen door.

Unit 23

  • Fix holes in back door.
  • Fit new glass where extraction for lasercutter is currently.
  • Fill in hole where the duct comes through the wall from the workshop.
  • Wash concrete block walls, and any that still look crappy, repaint.

Outside

  • Sweep balconies for any items.