Hackspace Move/Cremer Restoration: Difference between revisions

From London Hackspace Wiki
No edit summary
No edit summary
Line 17: Line 17:
** power drills, screwdriver bits and drills.
** power drills, screwdriver bits and drills.
** hoover
** hoover
** trowel, cold chisel, lump hammer, shovel (for brickwork)
** adjustable spanners/other plumbing tools
** adjustable spanners/other plumbing tools
** trowel
** cold chisel
** lump hammer
** shovel
** sawhorses (for painting doors)
=== supplies to order ===
Need estimates of amounts!
* black glossy paint, enough for 8 doors (2 per loo) + frames
* wall filler
* breeze blocks
* sand
* cement
=== supplies we already have at hackspace ===
* white paint


== Toilets ==
== Toilets ==

Revision as of 12:30, 17 April 2013

This is a list of things that need to be fixed or restored once we leave Cremer st. Please add anything you can think of, they will be struck off once we have confirmation that the work doesn't need to be done, or is completed.

Supplies

Supplies needed:

  • breeze blocks for repairing the hole between 24, sand, cement.
  • black (gloss) and white (emulsion) paint.
  • wall filler
  • wood and glass for replacing laser cutter ventilation window.
  • Tools:
    • Rags and buckets.
    • Paint scraper and wall filler tool
    • Paint brushes, rollers, and tray.
    • screwdrivers
    • hammer
    • power drills, screwdriver bits and drills.
    • hoover
    • adjustable spanners/other plumbing tools
    • trowel
    • cold chisel
    • lump hammer
    • shovel
    • sawhorses (for painting doors)

supplies to order

Need estimates of amounts!

  • black glossy paint, enough for 8 doors (2 per loo) + frames
  • wall filler
  • breeze blocks
  • sand
  • cement

supplies we already have at hackspace

  • white paint

Toilets

  • Paint all walls white in toilets.
  • Paint toilet doors black.
  • biolab/darkroom - Remove shelving/work surface, restore partition (and door ?), and replace loo and basin that have been removed and stored.

Unit 24

  • Repair holes in front door/remove camera from spy hole and outside door.
  • Restore connecting wall to 23.
  • Replace kitchen sink in original location, which was under the laptop bar: on the right as you walk into the main room of 24.
  • Remove everything else in kitchen.
  • Remove waste pipe to 23.
  • Wash concrete block walls, fill holes, and paint where necessary.
  • Collect decorative electrical panels - one by front door, possibly one by kitchen door.

Unit 23

  • Fit new glass where extraction for lasercutter is currently.
  • Fill in hole where the duct comes through the wall from the workshop.
  • Wash concrete block walls, fill holes, and paint where necessary.

Outside

  • Sweep balconies for any items.