| putty knives || from hackspace || 3
| putty knives || from hackspace || 3
|-
|-
| pollyfilla || bought (in hackspace now) || 1 bucket (may need more)
| pollyfilla || bought || 1 bucket (may need more)
|-
|-
| work gloves || from hackspace || 3 pairs
| work gloves || from hackspace || 3 pairs
Line 52: Line 52:
| white emulsion paint || from space || 2 huge buckets, to start
| white emulsion paint || from space || 2 huge buckets, to start
|-
|-
| grey undercoat || bought (stored in space) || 1 litre
| grey undercoat || bought || 1 litre
|-
|-
| black gloss || bought (stored in space) || 1 litre
| black gloss || bought || 1 litre
|-
|-
| mineral spirits || from hackspace / to buy || 1 jug (litre?)
| mineral spirits || from hackspace / to buy || 1 jug (litre?)
Line 98: Line 98:
| pane of Georgian wired glass || to buy || NxM
| pane of Georgian wired glass || to buy || NxM
|-
|-
| glass sealant || bought (stored in space) || 1 canister
| glass sealant || bought || 1 canister
|-
|-
| sandpaper || from hackspace || various
| sandpaper || from hackspace || various

Revision as of 22:44, 18 April 2013

This is a list of things that need to be fixed or restored once we leave Cremer st. Please add anything you can think of, they will be struck off once we have confirmation that the work doesn't need to be done, or is completed.

Supplies

The various supplies that have been bought and stored at the hackspace are on the last row of member box shelves in plastic bags with labels on them.

Supplies needed this weekend
Cleaning
buckets from hackspace 3
rags from hackspace infinity
henry already at cremer 1
paint scraper from hackspace 1
power sander + sandpaper from hackspace 1
bins for transporting tools from hackspace 3
Fixing holes in walls
screwdrivers from hackspace 2 posidriv, 1 phillips, 1 slotted
grippers from hackspace 3
putty knives from hackspace 3
pollyfilla bought 1 bucket (may need more)
work gloves from hackspace 3 pairs
Painting
brushes from hackspace, if clean / to buy 3 total
roller frames from hackspace 2
rollers to buy 2
trays to buy 1
coveralls from hackspace as many as we can borrow
white emulsion paint from space 2 huge buckets, to start
grey undercoat bought 1 litre
black gloss bought 1 litre
mineral spirits from hackspace / to buy 1 jug (litre?)
rubber gloves from hackspace / to buy 2 pairs
Rebuilding loo door
door itself at hackspace stored in workshop against wall between member boxes and machine tools.
Wood to buy ?
Pane of frosted glass to buy ?
Drill already at cremer 1
forstner bit set from hackspace 1
wood screws from hackspace various sizes
tape measure from hackspace 1
1/2" or 3/4" chisel from hackspace 1
level from hackspace 1
wood saw from hackspace 1
sawhorses from hackspace 2
hammer drill from hackspace 1
masonry drill set from hackspace 1
masonry screws from hackspace / to buy a bunch
Reinstalling loo window
pane of Georgian wired glass to buy NxM
glass sealant bought 1 canister
sandpaper from hackspace various
caulking gun from hackspace 1
Masonry (if we do it ourselves)
breeze blocks to buy ??
shovel ?? 1
sheet of wood (for mortar) from space 1
bricklaying trowel to buy 1
cold chisel from space 1
lump hammer from space 1
brick jointer to buy ??
cement to buy ??
aggregate to buy ??
Fixing holes in front door
wall filler bought 1 small tin
???
Removing Kitchen
???
Plumbing
adjustable spanner from hackspace 1
???
Fixing holes in front door
scrap wood from space several pieces
wood saw from space 1
drill already at cremer 1
wood drill set from hackspace 1
screwdriver bit from hackspace assortment
wood screws from hackspace various
Misc
hammer from space 1

Toilets

  • Paint all walls white in toilets.
  • Paint toilet doors black.
  • biolab/darkroom - Remove shelving/work surface, restore partition (and door ?), and replace loo and basin that have been removed and stored.

Unit 24

  • Repair holes in front door/remove camera from spy hole and outside door.
  • Restore connecting wall to 23.
  • Replace kitchen sink in original location, which was under the laptop bar: on the right as you walk into the main room of 24.
  • Remove everything else in kitchen.
  • Remove waste pipe to 23.
  • Wash concrete block walls, fill holes, and paint where necessary.
  • Collect decorative electrical panels - one by front door, possibly one by kitchen door.

Unit 23

  • Fit new glass where extraction for lasercutter is currently.
  • Fill in hole where the duct comes through the wall from the workshop.
  • Wash concrete block walls, fill holes, and paint where necessary.

Outside

  • Sweep balconies for any items.