Difference between revisions of "Hackspace Move/TODO"
Jump to navigation
Jump to search
Line 19: | Line 19: | ||
* <s>Take up the remainder of the wooden floor downstairs</s> ON HOLD | * <s>Take up the remainder of the wooden floor downstairs</s> ON HOLD | ||
* Collect all the rubbish in the car-park and put it in the bin | * Collect all the rubbish in the car-park and put it in the bin | ||
− | * <s>Move the bins to the far end of the car park<s> | + | * <s>Move the bins to the far end of the car park</s> |
* Clear the rubbish that has been shoved down the side of the wall in the car park (next to the front door) | * Clear the rubbish that has been shoved down the side of the wall in the car park (next to the front door) | ||
* Replace the bulbs in the car-park floodlights - which ones, iirc they work? maybe you mean the loading bay? | * Replace the bulbs in the car-park floodlights - which ones, iirc they work? maybe you mean the loading bay? |
Revision as of 17:43, 22 April 2013
Simple tasks that you can do right now
- Clean under the windows
- Clean windows in
- The quiet room
- The main area
- The classroom
- Fit the projector screen on the far classroom wall (opposite the door) needs brackets making (accurate welding + metal forming), also very heavy will need more then one person.
- Fit the skirting board in the quiet room
- Tidy the quiet room into a quiet room rather than a bomb site - should wait for the network cables to be done.
- Move books from the back room next to the back door to the bookshelves
- Move electronics gear from the back room to the electronics area
- Fix lightbulbs in all the toilets
- Clean the kitchen - could do with painting and more shelves
- Assemble all tables in the main room, and put them to one side, or in desk clusters
- Empty the storage room next to the downstairs fire exit so we can store things in it. The blue foam can be put in the skip.
- Collect the downstairs wood-pile into one place out of the way
- Go through member boxes separating out boxes that are full of general equipment and do not belong to members, placing them on separate shelves that are clearly marked
Take up the remainder of the wooden floor downstairsON HOLD- Collect all the rubbish in the car-park and put it in the bin
Move the bins to the far end of the car park- Clear the rubbish that has been shoved down the side of the wall in the car park (next to the front door)
- Replace the bulbs in the car-park floodlights - which ones, iirc they work? maybe you mean the loading bay?
- Clear out and paint the entrance hall
- Paint the sign above the front entrance so it doesn't look horrible
- Make a london hackspace sign for the back gate
Ground Floor
Classroom
- fit
powerandnetwork socketsin the new walls. Network sockets done and gigabit certified. - finish new walls.
lift and fix broken bits of floorwill probably need the shelving removed
- finish a few trunking bits
- fit skirting board
fit access point to ceiling - needs to wait for paint to drypaint walls - almost done!- fit doors
Lobby
fix doorbelldone!- wire up a doorbot and the doorbell and bellpush etc.
Elsewhere
- more network sockets
- more power sockets
- clean under windows. - 1/4 done
quiet room
- run network to basement
fit access point.move shelves- paint walls
- clean windows
replace damaged flooring- need to re-attach skirting board.
Back door area
fix doorlock (please!).- finish some trunking bits.
- finish boxing in doorbot.
Basement
Workshop
Filler wallsPaint metal shop floorSand walls - ThursdayPaint walls - ThursdayClad miniworkshop walls - FridayPut up power/network trunking - Friday- Place tools - Saturday
Place sockets/run cable - Saturday/Sunday- Run extraction to tools
- Automate filtration
- Run plumbing to workshop sink/biolab
biohacker room
- power sockets
internets
fttcconfig an access pointtest itclone config to other ap's- mount access points tidly
Post Move
This is a list of things that arn't vital to the space function but need to get done
Ground floor
- LOTS OF TIDYING
- Install a hood over the roller shutter door so there's no gap to the outside at the top when closed
Classroom
- Fit projector screen
- Fit projector
- Led board
Scrub paint from floors
elsewhere
- lasercutter
Lobby Area
- signage
basement
- Led board
car park
- We need an ashtray for the yard
Internets
- fit and fix the bandwidth meter
- spacefed
- v6 tunnel (?)
- A&A v6
- bufferbloat kernel and tuning
- bandwidth management of some kind.