Difference between revisions of "News/2010-08-24"
m (→Arcade machine) |
m (→Door) |
||
Line 31: | Line 31: | ||
== Door == | == Door == | ||
− | [[User:Nneil|Neil]] and [[User:Ms7821|Mark]] finally got the door system working. Please call | + | [[User:Nneil|Neil]] and [[User:Ms7821|Mark]] finally got the door system working. Please call ''Mark'' if you have trouble getting it open. |
== Lockpicking == | == Lockpicking == | ||
Steffen sent us some locks and picks to play with while we await the delivery of the [[Projects/Lockpicking/Sportsets|sports sets]]. There was lockpicking throughout the Tuesday meeting, but the main workshop/training session is on Monday 30th from 2pm. | Steffen sent us some locks and picks to play with while we await the delivery of the [[Projects/Lockpicking/Sportsets|sports sets]]. There was lockpicking throughout the Tuesday meeting, but the main workshop/training session is on Monday 30th from 2pm. |
Revision as of 00:42, 25 August 2010
Laser Cutter
We got our laser cutter.
Insert link to gallery of printed stuff
So far:
- Cardboard dinosaur
- Laser sign
- Pedobear sign
- Hackspace keyrings
See a video here.
As we're back in black the space paid for the rest of the pledge and VAT. The understanding is that we'll make plenty back by offering cutting services to people in the area.
A large number of keys for operating the machine will be cut, but it cannot be used without a safety induction (it's too easy to break).
Furniture
A load of very nice chairs were donated by Artag. These are worth £350+ each new.
Russ will be ordering the wood for the worktops some time this week, so we may be building these on Bank Holiday Monday (30th).
Vinyl Cutter
Muz has got the vinyl cutter working, with some prior help from Artag.
Arcade machine
The arcade machine now has freeplay enabled. Mameification will follow in the next few weeks.
Door
Neil and Mark finally got the door system working. Please call Mark if you have trouble getting it open.
Lockpicking
Steffen sent us some locks and picks to play with while we await the delivery of the sports sets. There was lockpicking throughout the Tuesday meeting, but the main workshop/training session is on Monday 30th from 2pm.