Infrastructure meeting: Difference between revisions

From London Hackspace Wiki
No edit summary
(add stuff from 10 jan infrastructure meeting,)
Line 10: Line 10:


== Upcoming meetings ==
== Upcoming meetings ==
== Past meetings ==
* [[Infrastructure/Meeting_2011-01-10| Meeting 1: 10th January 2011]]
* [[Infrastructure/Meeting_2011-01-10| Meeting 1: 10th January 2011]]
== Past meetings ==
  See meeting page linked above for a writeup of the discussion including some action points
 
== Ongoing projects ==
== Ongoing projects ==
More desks/work surfaces is vital, all available space is sometimes take up by people working from the space 9am-5pm ?!?
Apparantely getting the laser cutter moved is the main blocking issues to assembling a load of desks (apart from people
getting miscellaneous bolts etc and actually assembing the desks)

Revision as of 21:34, 10 January 2011

We meet to argue about setting up Laboratory 23 & 24.

Saves on arguments later.

Come throw in your tuppence worth.

Come and offer the skills you've got.

Come and see what skills you can learn...

Upcoming meetings

Past meetings

  See meeting page linked above for a writeup of the discussion including some action points

Ongoing projects

More desks/work surfaces is vital, all available space is sometimes take up by people working from the space 9am-5pm ?!? Apparantely getting the laser cutter moved is the main blocking issues to assembling a load of desks (apart from people getting miscellaneous bolts etc and actually assembing the desks)