Equipment/1F-Floorports
< Equipment
Jump to navigation
Jump to search
Revision as of 22:08, 24 May 2021 by Mich181189 (talk | contribs)
- 10.0.10.11 (1f-floorports1.mgmt.london.hackspace.org.uk) (Telnet - will set up SSH at some point)
- 10.0.10.12 (1f-floorports2.mgmt.london.hackspace.org.uk) (Telnet - will set up SSH at some point)
- 10.0.10.13 (1f-floorports3.mgmt.london.hackspace.org.uk) (Telnet - will set up SSH at some point)
- Handle the numerous floor ports around the first floor
- Basically, everything except the last two ports is a floor port
1f-floorports1, 1f-floorports2
- 48 port switches
Port(s) | Type | VLAN | Connected To |
---|---|---|---|
1-44 | Gigabit Copper | FloorPorts(70) | General floor ports |
44-46 | Gigabit Copper or SFP | FloorPorts(70) | General floor ports |
46-48 | Gigabit Copper or SFP | Trunk | Uplink to Core Switch |
1f-floorports3
- 24 port switch
Port(s) | Type | VLAN | Connected To |
---|---|---|---|
1-20 | Gigabit Copper | FloorPorts(70) | General floor ports |
21-22 | Gigabit Copper or SFP | FloorPorts(70) | General floor ports |
23-24 | Gigabit Copper or SFP | Trunk | Uplink to Core Switch |