Hackspace Move/TODO

From London Hackspace Wiki
Jump to navigation Jump to search

Simple tasks that you can do right now

  • Clean under the windows
  • Clean windows in
    • The quiet room
    • The main area
    • The classroom
  • Fit the projector screen on the far classroom wall (opposite the door) needs brackets making (accurate welding + metal forming), also very heavy will need more then one person.
  • Fit the skirting board in the quiet room
  • Tidy the quiet room into a quiet room rather than a bomb site - should wait for the network cables to be done.
  • Move books from the back room next to the back door to the bookshelves
  • Move electronics gear from the back room to the electronics area
  • Fix lightbulbs in all the toilets
  • Clean the kitchen - could do with painting and more shelves
  • Assemble all tables in the main room, and put them to one side, or in desk clusters
  • Empty the storage room next to the downstairs fire exit so we can store things in it. The blue foam can be put in the skip.
  • Collect the downstairs wood-pile into one place out of the way
  • Go through member boxes separating out boxes that are full of general equipment and do not belong to members, placing them on separate shelves that are clearly marked
  • Take up the remainder of the wooden floor downstairs ON HOLD
  • Collect all the rubbish in the car-park and put it in the bin
  • Move the bins to the far end of the car park
  • Clear the rubbish that has been shoved down the side of the wall in the car park (next to the front door)
  • Replace the bulbs in the car-park floodlights - which ones, iirc they work? maybe you mean the loading bay?
  • Clear out and paint the entrance hall
  • Paint the sign above the front entrance so it doesn't look horrible
  • Make a london hackspace sign for the back gate

Ground Floor

Classroom

  • fit power and network sockets in the new walls. Network sockets done and gigabit certified.
  • finish new walls.
  • lift and fix broken bits of floor
    • will probably need the shelving removed
  • finish a few trunking bits
  • fit skirting board
  • fit access point to ceiling - needs to wait for paint to dry
  • paint walls - almost done!
  • fit doors

Lobby

  • fix doorbell done!
  • wire up a doorbot and the doorbell and bellpush etc.

Elsewhere

  • more network sockets
  • more power sockets
  • clean under windows. - 1/4 done

quiet room

  • run network to basement
  • fit access point.
  • move shelves
  • paint walls
  • clean windows
  • replace damaged flooring
    • need to re-attach skirting board.

Back door area

  • fix doorlock (please!).
  • finish some trunking bits.
  • finish boxing in doorbot.

Basement

Workshop

  • Filler walls
  • Paint metal shop floor
  • Sand walls - Thursday
  • Paint walls - Thursday
  • Clad miniworkshop walls - Friday
  • Put up power/network trunking - Friday
  • Place tools - Saturday
  • Place sockets/run cable - Saturday/Sunday
  • Run extraction to tools
  • Automate filtration
  • Run plumbing to workshop sink/biolab

biohacker room

  • power sockets

internets

  • fttc
  • config an access point
    • test it
    • clone config to other ap's
    • mount access points tidly

Post Move

This is a list of things that arn't vital to the space function but need to get done

Ground floor

  • LOTS OF TIDYING
  • Install a hood over the roller shutter door so there's no gap to the outside at the top when closed

Classroom

  • Fit projector screen
  • Fit projector
  • Led board
  • Scrub paint from floors

elsewhere

  • lasercutter

Lobby Area

  • signage

basement

  • Led board

car park

  • We need an ashtray for the yard

Internets

  • fit and fix the bandwidth meter
  • spacefed
  • v6 tunnel (?)
  • A&A v6
  • bufferbloat kernel and tuning
  • bandwidth management of some kind.