Networking Todo
From London Hackspace Wiki
Please use redmine for future features etc.
quiet room rack
upgrade ios on the switchesra guard if we can, oruse one of the linux things on boole.2nd 2 port trunk to go down to the basement rack2nd patch panelterminate the 2 cables to outside the classroomterminate the 4 cables to the basement- thanks Aden.finish ground floor wireingclassroom east and south walls- we gave upmain room south walldone.
fit everything into the rackreattach doors and walls- I don't think the door will ever fit- maybe try sound proof tiles on the walls?
- print out the patch panel port destinations and stick to the inside of the door and the wall under the rack
test port 3 on the 4 cables going to the basement
basement rack
rack powerattempt to recalibrate upsups in rackpatch panel in rackterminate 4 cables from quiet room3com switch in rackconfig a 2nd 2 port trunk on a switch in the quiet roomlink everything together- Get remote access to the pdu sorted out
- graph the PDU power usage
- graph the UPS state
- print out the patch panel port destinations and stick on the wall by the rack
boole
Get more a&a details when it happens -? for the bandwidth usage?- v6 all the things. (since our ip range will change we have to fix all the dns as well)
- fiddle with dns, can we tell unbound to not cache the local zones?
- upgrade so we can get a 3.8 kernel, then patch with bufferbloat stuff
wifi
spacenet- reduce transmit power?
- we may be getting a WLC :)
Pretty things
Get the bandwidth meter working again