Erected the drywall upstairs: | |||
[[File: | [[File:20130329_163135.jpg|400px]] | ||
And rockwalled it | |||
[[File:20130329_163844.jpg|400px]] | |||
Filled and sanded gaps, and installed boxes for sockets | |||
[[File:20130407_200350.jpg|400px]] | |||
Lifted the basement floor | |||
[[File: | [[File:20130329_181326.jpg|400px]] | ||
And started the partitions | |||
[[File: | [[File:20130329_163356.jpg|400px]] | ||
Which will also be rockwalled | |||
[[File:20130329_163255.jpg|400px]] | [[File:20130329_163255.jpg|400px]] | ||
Run network cabling for the ground floor | Run network cabling for the ground floor | ||
Line 33: | Line 35: | ||
[[File:20130406_171659.jpg|400px]] | [[File:20130406_171659.jpg|400px]] | ||
Took down one asbestos-based tile and put it in the storage room by the main door. Please don't touch it - if you do, contact the trustees. | |||
[[File:20130406_173357.jpg|400px]] | [[File:20130406_173357.jpg|400px]] | ||
Line 43: | Line 45: | ||
== This weekend == | == This weekend == | ||
Finished the partitions downstairs | |||
[[File:20130406_172232.jpg|400px]] | [[File:20130406_172232.jpg|400px]] | ||
Line 55: | Line 57: | ||
[[File:20130406_173517.jpg|400px]] | [[File:20130406_173517.jpg|400px]] | ||
Painted the floor. There are some cracks near the lift that still need filling | |||
[[File:20130406_220148.jpg|400px]] | [[File:20130406_220148.jpg|400px]] |