Hackspace Move/Cremer Restoration

From London Hackspace Wiki

This is a list of things that need to be fixed or restored once we leave Cremer st. Please add anything you can think of, they will be struck off once we have confirmation that the work doesn't need to be done, or is completed.

Supplies needed:

  • brick/blocks for repairing the hole between 24
  • black and white paint.
  • wall filler
  • wood and glass for replacing laser cutter ventilation window.
  • Tools:
    • Rags and buckets.
    • Paint scraper and wall filler tool
    • Paint brushes, rollers, and tray.
    • screwdrivers
    • hammer
    • power drills, screwdriver bits and drills.
    • hoover

Toilets

  • Paint all walls white in toilets.
  • Paint toilet doors black.
  • biolab/darkroom - Remove shelving/work surface, restore partition, and replace loo and basin that have been removed and stored.

Unit 24

  • Repair holes in front door/remove camera from spy hole and outside door.
  • Restore connecting wall to 23.
  • Replace kitchen sink in original location, which was under the laptop bar: on the right as you walk into the main room of 24.
  • Remove everything else in kitchen.
  • Remove waste pipe to 23.
  • Wash concrete block walls, fill holes, and paint where necessary.
  • Collect decorative electrical panels - one by front door, possibly one by kitchen door.

Unit 23

  • Fit new glass where extraction for lasercutter is currently.
  • Fill in hole where the duct comes through the wall from the workshop.
  • Wash concrete block walls, fill holes, and paint where necessary.

Outside

  • Sweep balconies for any items.