Hackspace Move/TODO
From London Hackspace Wiki
Pre Move
All this stuff needs to be done before we can officially open
Ground Floor
Classroom
- fit
powerandnetwork socketsin the new walls. Network sockets done and gigabit certified. - finish new walls.
lift and fix broken bits of floorwill probably need the shelving removed
- finish a few trunking bits
- fit skirting board
fit access point to ceiling - needs to wait for paint to drypaint walls - almost done!- fit doors
Lobby
fix doorbelldone!- wire up a doorbot and the doorbell and bellpush etc.
Elsewhere
- more network sockets
- more power sockets
- clean under windows. - 1/4 done
quiet room
- run network to basement
fit access point.move shelves- paint walls
- clean windows
replace damaged flooring- need to re-attach skirting board.
Back door area
fix doorlock (please!).- finish some trunking bits.
- finish boxing in doorbot.
Basement
Workshop
Filler wallsPaint metal shop floor- Sand walls - Thursday
- Paint walls - Thursday
- Clad miniworkshop walls - Friday
- Put up power/network trunking - Friday
- Place tools - Saturday
- Place sockets/run cable - Saturday/Sunday
- Run extraction to tools
- Automate filtration
- Run plumbing to workshop sink/biolab
biohacker room
- power sockets
internets
fttcconfig an access pointtest itclone config to other ap's- mount access points tidly
Post Move
This is a list of things that arn't vital to the space function but need to get done
Ground floor
- LOTS OF TIDYING
- Install a hood over the roller shutter door so there's no gap to the outside at the top when closed
Classroom
- Fit projector screen
- Fit projector
- Led board
Scrub paint from floors
elsewhere
- lasercutter
Lobby Area
- signage
basement
- Led board
Internets
- fit and fix the bandwidth meter
- spacefed
- v6 tunnel (?)
- A&A v6
- bufferbloat kernel and tuning
- bandwidth management of some kind.