Hackspace Move/Cremer Restoration
This is a list of things that need to be fixed or restored once we leave Cremer st. Please add anything you can think of, they will be struck off once we have confirmation that the work doesn't need to be done, or is completed.
I see a red door and I want to paint it black...
- Clean off the brushes and close the paint tins after each coat and when finished! This paint should be quite easy to take off.
- Don't forget the edges of the door!
Supplies
The various supplies that have been bought and stored at the hackspace are on the last row of member box shelves in plastic bags with labels on them.
The big saw with the red handle is used for cutting breeze blocks to size (for irregular / thin shapes). Thick shapes can be cut with the cold chisel and hammer. First, go around the entire block, only chiseling 1-2mm deep. Then keep going deeper each time and eventually it will break, leaving a nice rough surface for the mortar to stick to.
task | 23-L | 23-R | 24-L | 24-R |
---|---|---|---|---|
All surfaces clean | ||||
Wall plugs removed & holes filled | ||||
Doors scraped free of stickers | ||||
Walls all white, doors & frames all black |
Pane of wavy/frosted glass | to buy | ? NxM |
pane of Georgian wired glass | to buy | NxM |
Checklist for weekend 20-21
- Cleaning
- Clean walls
- Clean sinks
- Repair holes in walls
- Painting red door black
- see above
- Wetroom
- Install toilet (and bathroom sink?) and new plumbing -- should be able to wait until after masonry.
- Install partition wall and door.
- Masonry
- 1 wetroom
- 2 fill holes in walls
- 3 finally block up connecting doorway
- ??? be very careful! get everything sorted before mixing mortar
- General painting -- AFTER WETROOM DONE
- Paint walls and entrance door
- Paint partition wall
Checklist for weekend 27-28
- Finish plumbing
- ???
- Remove doorbot and repair holes in door
Water Stopcock locations
In unit 23, in the corner where the member boxes were. In unit 24, in cupboard next to the toilet.
Toilets
- Paint all walls white in toilets.
- Paint toilet doors black.
- biolab/darkroom - Remove sink and shelving/work surface, restore partition (and door ?), and replace loo and basin that have been removed and stored.
Unit 24
- Repair holes in front door/remove camera from spy hole and outside door.
- Restore connecting wall to 23.
- Replace kitchen sink in original location, which was under the laptop bar: on the right as you walk into the main room of 24.
- Remove everything else in kitchen.
- Remove waste pipe to 23.
- Wash concrete block walls, fill holes, and paint where necessary.
- Collect decorative electrical panels -
one by front door, possibly one by kitchen door.
Unit 23
- Fit new glass where extraction for lasercutter is currently.
- Fill in hole where the duct comes through the wall from the workshop.
- Wash concrete block walls, fill holes, and paint where necessary.
Outside
- Sweep balconies for any items.
Measurements
- Size of breeze blocks: 440 x 215 x 100mm
- inter-unit doorway approx size: 1170 x 2240mm
- new door to be installed in loo: 686 x 1981mm
- height of ceiling in loo -- to be measured (may be uneven)
- approx area to brick up in loo: 1000 x 2700mm
- door frame timber: 50x100mm
- external loo window to fix: 854mm x 232 mm -- someone should double-check before ordering
Suppliers
MP Building Supplies 282 Cambridge Heath Road, Bethnal Green London, E2 9DA 020 7729 1699 Open: Mon: 07:00 - 17:00 Tue: 07:00 - 17:00 Wed: 07:00 - 17:00 Thu: 07:00 - 17:00 Fri: 07:00 - 17:00 Sat: 08:00 - 14:00