Difference between revisions of "447 Networking"

From London Hackspace Wiki
Jump to navigation Jump to search
(update sockets)
Line 18: Line 18:
 
*  3 -  4 office under cab
 
*  3 -  4 office under cab
 
*  5 office under cab - single socket
 
*  5 office under cab - single socket
*  6 behind counter - single socket.
+
*  6,7,8,9,10,11,12 - classroom
7 8 counter office
 
9 - 10 behind counter
 
* 11 - 12 behind counter
 
 
* 13 - 14 pillar near shower
 
* 13 - 14 pillar near shower
 
* 15 - 16 left of roller door
 
* 15 - 16 left of roller door
 
* 17 - 18 rear wall of lobby
 
* 17 - 18 rear wall of lobby
 
 
* 27 - 28 office under cab
 
* 27 - 28 office under cab
* 29 office under cab
+
* 29 - office under cab
 +
* 30-35 - classroom
 +
* 36,37 - doorbot
  
 
=== To be added ===
 
=== To be added ===

Revision as of 18:41, 29 March 2013

There is a 48 port patch panel in the cab in the office upstairs, of which 29 ports are used.

The Cab has 7 free U, we need 2 for the switches and 1 for Boole leaving 4...

N.B. new plans depend on working out what we need for new classrooms etc.

Our ISP

80/20 FTTC, 1Tb bandwidth/mo with Zen.

No native IPv6 unfortunately -- reasonable IPv6 ISPs with large bandwidth caps are too expensive for us.

Ground Floor

Existing

  • 1 - 2 office near window
  • 3 - 4 office under cab
  • 5 office under cab - single socket
  • 6,7,8,9,10,11,12 - classroom
  • 13 - 14 pillar near shower
  • 15 - 16 left of roller door
  • 17 - 18 rear wall of lobby
  • 27 - 28 office under cab
  • 29 - office under cab
  • 30-35 - classroom
  • 36,37 - doorbot

To be added

Rear Door

Socket needed for doorbot (Wilson) I'd suggest running a double to here

Office / Classroom 1

  • 5 x double socket

Classroom 2

Has to be built 1st!

  • 9 x double sockets

Along wall facing street

  • A double socket every x meters?

new office that replaces the counter

  • A double socket every x meters?

Basement

Existing

  • 19 - 20 on far wall near hose reel and phone dist boards.
  • 21 - 22 on wall on outside of lift plant room
  • 23 - 24 biohack basement on far wall.
  • 25 - 26 near fire hose pumps hidden behind the desk/counter

To be added

  • 1 x double socket near biohackers door for ac node/doorbot
  • 2 x double socket in each workshop for acnode
  • ?

Total new sockets

5 + 9 + 1 + 2 = 34, we need 1 more patch panel, would have 9 free ports.