== TODO ==
 
== TODO ==
* Clean from the rubbish/junk
+
* <s>Clean from the rubbish/junk</s>
 
* Install staubli semi-permamently
 
* Install staubli semi-permamently
** Draw up the current proposals
+
** <s>Draw up the current proposals</s>
** Agree on placement/safety
+
** <s>Agree on placement/safety<s/>
 
** Make!
 
** Make!
  
 
== Clean-up ==
 
== Clean-up ==
[[File:CNC_Robotics_cleanup_1.jpg|thumb|Area that needs cleaning up]]
+
[[File:CNC_Robotics_area_before_cleanup.jpg|thumb|Before clean]]
 +
[[File:CNC_Robotics_area_after_cleanup.jpg|thumb|After clean]]
  
 
* networking cabled -> gimp closet
 
* networking cabled -> gimp closet
* 5kW, 3ph fans + related electrics -> ?
+
* 5kW, 3ph fans -> skip
* table legs -> ?
+
* A mix of heavy duty electric switches -> boiler room
 +
* table legs -> out of the way
 
* floor laminate sheets -> skip
 
* floor laminate sheets -> skip
  

Revision as of 12:07, 12 February 2014

Located in the far end of the basement, aimed primarily for robotics projects and CNC machinery

TODO

  • Clean from the rubbish/junk
  • Install staubli semi-permamently
    • Draw up the current proposals
    • Agree on placement/safety
    • Make!

Clean-up

Before clean
After clean
  • networking cabled -> gimp closet
  • 5kW, 3ph fans -> skip
  • A mix of heavy duty electric switches -> boiler room
  • table legs -> out of the way
  • floor laminate sheets -> skip

Equipment