This documents efforts at improving the layout and infrastructure at the space.
  
 +
== Upcoming meetings ==
 +
 +
See [[Infrastructure meeting]]
 +
 +
== Ongoing projects ==
 +
 +
=== Quiet Room carpet ===
 +
 +
* Description: ...
 +
* Status: carpet is there, fittings have been ordered
 +
* People: Robert, Adrian
 +
 +
=== Kitchen Flooring ===
 +
 +
* Description: ...
 +
* Status: need to put down a screed, needs to be ordered/bought. Then use the vinyl we have or buy resin paint. This requires financial assessment first.
 +
* People: ?
 +
 +
=== Kitchen Plumbing ===
 +
 +
* Description: ...
 +
* Status: hot water generator needs to be moved from unit 23, cold water pipe run to the kitchen, and waste water out.
 +
* People: ?
 +
 +
=== Kitchen Wiring ===
 +
 +
* Description: wiring for oven and hob. Needs to be certified by an electrician.
 +
* Status:
 +
* People: Russ
 +
 +
=== Kitchen Units ===
 +
 +
* Description: ...
 +
* Status: materials all there, need fitting in place once floor, wiring, plumbing are done.
 +
* People: Phil
 +
 +
=== Wetlab/Darkroom ===
 +
 +
* Description: [[Darkroom]]
 +
* Status: started building some work surfaces
 +
* People: Phil, AlexP
 +
 +
=== Lab "Extractor" Bench ===
 +
 +
* Description: ...
 +
* Status: needs removal. Auction off?
 +
* People: ?
 +
 +
=== Unit 23 Toilet ===
 +
 +
* Description: ...
 +
* Status: need to remove furnace, sweep it
 +
* People: ?
 +
 +
=== Quiet Room Screen ===
 +
 +
* Description: for projections
 +
* Status: need to obtain epoxy bolts, then put up screen
 +
* People: Adrian (?)
 +
 +
=== Quiet Room Projector ===
 +
 +
* Description: replace existing projector with the NEC projector, mount it properly
 +
* Status:
 +
* People: ?
 +
 +
=== Reorganise use of Unit 23 Space ===
 +
 +
* Description: optimise storage areas etc
 +
* Status: start with [[Space_Organising_Day]] and use as opportunity to assess the layout
 +
* People: ?
 +
 +
=== Box in Lasercutter extraction ===
 +
 +
* Description: ...
 +
* Status: ?
 +
* People: Billy (?)
 +
 +
=== Tool Access Control ===
 +
 +
* Description: [[Projects/Tool_Access_Control]]
 +
* Status: someone needs to implement this
 +
* People: ?
 +
 +
=== Wiring Burglar Alarm Sensors ===
 +
 +
* Description: ... so we can monitor them, implement reminders ("close the back doors") etc
 +
* Status:
 +
* People: ?
 +
 +
=== Create "Time To Live" Stickers ===
 +
 +
* Description: to label unmarked objects that you want to nominate for removal. Cf Phil's "Do Not Hack" stickers.
 +
* Status:
 +
* People: ?

Revision as of 20:31, 28 June 2011

This documents efforts at improving the layout and infrastructure at the space.

Upcoming meetings

See Infrastructure meeting

Ongoing projects

Quiet Room carpet

  • Description: ...
  • Status: carpet is there, fittings have been ordered
  • People: Robert, Adrian

Kitchen Flooring

  • Description: ...
  • Status: need to put down a screed, needs to be ordered/bought. Then use the vinyl we have or buy resin paint. This requires financial assessment first.
  • People: ?

Kitchen Plumbing

  • Description: ...
  • Status: hot water generator needs to be moved from unit 23, cold water pipe run to the kitchen, and waste water out.
  • People: ?

Kitchen Wiring

  • Description: wiring for oven and hob. Needs to be certified by an electrician.
  • Status:
  • People: Russ

Kitchen Units

  • Description: ...
  • Status: materials all there, need fitting in place once floor, wiring, plumbing are done.
  • People: Phil

Wetlab/Darkroom

  • Description: Darkroom
  • Status: started building some work surfaces
  • People: Phil, AlexP

Lab "Extractor" Bench

  • Description: ...
  • Status: needs removal. Auction off?
  • People: ?

Unit 23 Toilet

  • Description: ...
  • Status: need to remove furnace, sweep it
  • People: ?

Quiet Room Screen

  • Description: for projections
  • Status: need to obtain epoxy bolts, then put up screen
  • People: Adrian (?)

Quiet Room Projector

  • Description: replace existing projector with the NEC projector, mount it properly
  • Status:
  • People: ?

Reorganise use of Unit 23 Space

  • Description: optimise storage areas etc
  • Status: start with Space_Organising_Day and use as opportunity to assess the layout
  • People: ?

Box in Lasercutter extraction

  • Description: ...
  • Status: ?
  • People: Billy (?)

Tool Access Control

Wiring Burglar Alarm Sensors

  • Description: ... so we can monitor them, implement reminders ("close the back doors") etc
  • Status:
  • People: ?

Create "Time To Live" Stickers

  • Description: to label unmarked objects that you want to nominate for removal. Cf Phil's "Do Not Hack" stickers.
  • Status:
  • People: ?