This documents efforts at improving the layout and infrastructure at the space.

Ongoing projects

Quiet Room carpet

  • Description: ...
  • Status:Carpet down
  • People: Robert, Adrian, Phil
  • Schedule: Monitor for adhesion problems....

Kitchen Flooring

  • Description: ...
  • Status: Floor done
  • People: ?

Kitchen Plumbing

  • Description: ...
  • Status: hot water generator needs to be moved from unit 23, cold water pipe run to the kitchen, and waste water out.
  • People: ?

Kitchen Wiring

  • Description: wiring for oven and hob. Needs to be certified by an electrician.
  • Status:
  • People: Russ

Kitchen Units

  • Description: ...
  • Status: materials all there, need fitting in place once floor, wiring, plumbing are done.
  • People: Phil

Wetlab/Darkroom

  • Description: Darkroom
  • Status: started building some work surfaces, Supports part finished.
  • People: Phil, AlexP

Lab "Extractor" Bench

  • Description: ...
  • Status: Dismantled and removed from Wet Lab.
  • People: ?

Unit 23 Toilet

  • Description: ...
  • Status: Clean and tidy, Flushes OK
  • People: ?

Quiet Room Screen

  • Description: for projections
  • Status: need to obtain epoxy bolts, then put up screen
  • People: Adrian (?)
  • Proposal : drill and epoxy bolts into ceiling near window. Drill auxiliary fixings to hold bolts in place while epoxy sets. After setting, perform pull test on bolts. Schedule team of helpers to lift screen into place and fix. These activities will create some dust, mess and brief disruption in the quiet room.
  • Requirements : epoxy capsules (I have some of these, possibly date-expired - artag), studding, large masonry drill bit, heavy duty power drill. I also have the latter 2, but can't bring them to the space cleaning day. It may be possible to do the drilling phase before that date.

Quiet Room Projector

  • Description: replace existing projector with the NEC projector, mount it properly
  • Status: New mounting part built, to replace a ceiling tile.
  • People: Phil

Reorganise use of Unit 23 Space

  • Description: optimise storage areas etc
  • Status: start with Space_Organising_Day and use as opportunity to assess the layout
  • People: ?

Box in Lasercutter extraction

  • Description: ...
  • Status: ?
  • People: Billy (?)

Tool Access Control

Wiring Burglar Alarm Sensors

  • Description: ... so we can monitor them, implement reminders ("close the back doors") etc
  • Status:
  • People: ?

Create "Time To Live" Stickers

  • Description: to label unmarked objects that you want to nominate for removal. Cf Phil's "Do Not Hack" stickers.
  • Status: HACK ME Stickers now available with space for "Dispose by" date
  • People: ?