* 5x Double dry lining boxes (25mm deep or more)
+
* <s>5x Double dry lining boxes (25mm deep or more)</s>
 
* 2x single dry lining boxes (any depth)
 
* 2x single dry lining boxes (any depth)
 
  
 
=== Suggested suppliers===
 
=== Suggested suppliers===

Revision as of 15:34, 14 March 2012

People: Paddyd, Phil, Russ

We have sockets and 2.5mm cable aplenty.

Phil's already done the ring main and water heater circuit, and a few sockets. Ms7821 09:28, 16 February 2012 (UTC)

Planned

  • Distro box: 3x32A breakers, 1x16A breaker (6 way suggested, so 2xblank)
  • 1x63A breaker
  • Cables:
Purpose Power Gauge Length
Distro 63A 16mm^2 >>1m+14m+4m = 20m
Oven 5kW (>>22A) 4mm^2 >>2m+2m = 5m
Hob 6kW/6.6kW (>>29A) 4mm^2 >>2m+2m = 5m
Water heater guess 3kW (13A) 2.5mm^2 >>2m = 3m
Ring main 2.5mm^2 >>((2m+2.5m+2.5m)+(2m+2m))*2 = 25m

Upgrade diameters (4-6, 16-25) if not clipped to a masonry or wooden wall. Phil suggests 18m for the 4mm and 26m for the distro feed

  • 50xP-clips for 16mm
  • 50xP-clips for 4mm

And to finish off the sockets:

  • 5x Double dry lining boxes (25mm deep or more)
  • 2x single dry lining boxes (any depth)

Suggested suppliers

  • TLC-direct (cheap, but whole drum)
  • ?


Back-up option

  • 2x4mm runs, one for hob, one for oven
  • Put boiler on a fused spur or do a separate 2.5/4mm run for that.