Difference between revisions of "Equipment/FormerCoreSwitch"

From London Hackspace Wiki
Jump to navigation Jump to search
(Initial stab at documenting the core switch)
 
Line 26: Line 26:
 
| 1-28 || Gigabit Copper || Servers(20) || General Servers (will soon be reconfigured)
 
| 1-28 || Gigabit Copper || Servers(20) || General Servers (will soon be reconfigured)
 
|-
 
|-
| 29-32 || Gigabit Copper || Trunk || [[Equipment/Landin|Landin]]
+
| 29-32 || Gigabit Copper || Trunk || [[Equipment/Landin|Landin]] LACP
 
|-
 
|-
 
| 33-48 || Gigabit Copper || Trunk || General Trunk Ports
 
| 33-48 || Gigabit Copper || Trunk || General Trunk Ports

Revision as of 17:28, 29 July 2018

coreswitch
Hackspace Unknown.png
Model Cisco Catalyst 3560G
Sub-category Networking
Status Good working order
Accessories Cat5 patch leads
Training requirement no
Origin Network Fairies
Location first floor comms room
Maintainers sysadmin team
  • 10.0.10.10 (coreswitch.mgmt.london.hackspace.org.uk) (Telnet - will set up SSH at some point)
  • Core switch - connected to Boole and Landin
Port(s) Type VLAN Connected To
1-28 Gigabit Copper Servers(20) General Servers (will soon be reconfigured)
29-32 Gigabit Copper Trunk Landin LACP
33-48 Gigabit Copper Trunk General Trunk Ports
49-52 Gigabit SFP Trunk General Trunk Ports