Hackspace Move/Cremer Restoration

From London Hackspace Wiki
Jump to navigation Jump to search

This is a list of things that need to be fixed or restored once we leave Cremer st. Please add anything you can think of, they will be struck off once we have confirmation that the work doesn't need to be done, or is completed.

Tasks marked with "++" are definitely needed, all others are to be confirmed.

Unit 24

  • Paint all walls white in toilets ++
  • Paint toilet doors black ++
  • Repair holes in front door/remove camer from spy hole and outside door ++
  • Restore connecting wall to 23 -- do we have brick for this (and unit 23 loo partition)?
  • Restore kitchen
  • Replace ceiling tiles
  • Paint all walls white in main rooms
  • Remove internal walls and false ceiling
  • Remove waste pipe to 23
  • Remove plastic strips
  • Collect decorative electrical panels - one by front door, possibly one by kitchen door

Unit 23

  • Fix holes in back door ++
  • Fit new glass where extraction for lasercutter is currently ++
  • Fill in hole where the duct comes through the wall from the workshop.++
  • Paint all walls back to white ++
  • Restore partition in loo and replace any loos or basins that have been removed

Outside

  • Sweep balconies for any items ++