The etch tank needs ventilation, running water and drainage, hence the plan is to locate it downstairs near the biolab.
+
The etch tank needs ventilation, running water and drainage, hence the plan is to locate it downstairs between the biolab and the lift shaft.

Revision as of 22:16, 24 March 2013

Electronics stations

Responsible: mentar

The plan is to have 2 soldering and 1 test bench upstairs


Etching station

The etch tank needs ventilation, running water and drainage, hence the plan is to locate it downstairs between the biolab and the lift shaft.