Difference between revisions of "Hackspace Move/Electronics"

From London Hackspace Wiki
Jump to navigation Jump to search
Line 1: Line 1:
 +
== Dependencies ==
 +
 +
* Ventilation (Paddy, Steve, Charles)
 +
** Mild HCL fumes likely, filter must be able to deal with these
 +
* Drainage (none!) - Normal requirements HCL not strong enough to warrant special treatment
 +
* Power (alisonw)
 +
* Comms (Jasper/tgreer) - Running water supply
 +
 
== Electronics stations ==
 
== Electronics stations ==
  

Revision as of 21:31, 25 March 2013

Dependencies

  • Ventilation (Paddy, Steve, Charles)
    • Mild HCL fumes likely, filter must be able to deal with these
  • Drainage (none!) - Normal requirements HCL not strong enough to warrant special treatment
  • Power (alisonw)
  • Comms (Jasper/tgreer) - Running water supply

Electronics stations

Responsible: mentar

The plan is to have 2 soldering and 1 test bench upstairs


Etching station

The etch tank needs ventilation, running water and drainage, hence the plan is to locate it downstairs between the biolab and the lift shaft.