Difference between revisions of "Hackspace Move/Electronics"

From London Hackspace Wiki
Jump to navigation Jump to search
Line 1: Line 1:
 +
Responsible: [[user:mentar|mentar]]
 +
 
== Dependencies ==
 
== Dependencies ==
  
Line 8: Line 10:
  
 
== Electronics stations ==
 
== Electronics stations ==
 
Responsible: [[user:mentar|mentar]]
 
  
 
The plan is to have 2 soldering and 1 test bench upstairs
 
The plan is to have 2 soldering and 1 test bench upstairs

Revision as of 21:31, 25 March 2013

Responsible: mentar

Dependencies

  • Ventilation (Paddy, Steve, Charles)
    • Mild HCL fumes likely, filter must be able to deal with these
  • Drainage (none!) - Normal requirements HCL not strong enough to warrant special treatment
  • Power (alisonw)
  • Comms (Jasper/tgreer) - Running water supply

Electronics stations

The plan is to have 2 soldering and 1 test bench upstairs


Etching station

The etch tank needs ventilation, running water and drainage, hence the plan is to locate it downstairs between the biolab and the lift shaft.