Hackspace Move/Electronics
Jump to navigation
Jump to search
Electronics stations
Responsible: mentar
The plan is to have 2 soldering and 1 test bench upstairs
Etching station
The etch tank needs ventilation, running water and drainage, hence the plan is to locate it downstairs near the biolab.