Difference between revisions of "Pledge: Basement plumbing"
Jump to navigation
Jump to search
m |
|||
Line 6: | Line 6: | ||
==The items== | ==The items== | ||
− | * A pump to push waste water upstairs to main drain pipe. Inflow and drainage pipes. | + | * A pump to push waste water upstairs to main drain pipe. |
+ | * Inflow and drainage pipes. | ||
+ | |||
+ | ==We should then have== | ||
+ | |||
+ | * Sink in the main workshop area with HOT WATER! | ||
+ | * 1 Sink in PCB/darkroom area | ||
+ | * working PCB etching tank | ||
+ | * Sink in the Biolab | ||
+ | |||
+ | |||
===Budget estimation=== | ===Budget estimation=== | ||
− | * £800. £590 for pump, rest on pipes. | + | * £800. (£590 for pump, rest on pipes. ) |
==Pledges== | ==Pledges== |
Revision as of 18:12, 30 September 2013
Installation of running water and drainage (with pump) for the basement. Pledge opened: 29 jul 2013
Pledge leader: Will
The items
- A pump to push waste water upstairs to main drain pipe.
- Inflow and drainage pipes.
We should then have
- Sink in the main workshop area with HOT WATER!
- 1 Sink in PCB/darkroom area
- working PCB etching tank
- Sink in the Biolab
Budget estimation
- £800. (£590 for pump, rest on pipes. )
Pledges
- £400 -- Biohackers
- £50 - Tom Hodder
Running total: £450
Target: £350