Difference between revisions of "Pledge: Darkroom"

From London Hackspace Wiki
Jump to navigation Jump to search
Line 1: Line 1:
 
__NOTOC__ __NOEDITSECTION__
 
__NOTOC__ __NOEDITSECTION__
  
''We are planning to build a darkroom for the space.''
+
''We've planning to build a darkroom for the new space since we got in. After months of chatting and estimating what is needed we have a dealine for building this up and its on the next Open Day 1st June. The room will be a multi-purpose darkroom. We are willing to develop and create experiments with film and screenprint among any other ideas!
 
+
 
Pledge opened: ''Not yet open''
 
Pledge opened: ''Not yet open''
  
Line 16: Line 16:
 
Blackout fabric - 30  
 
Blackout fabric - 30  
 
Door- 50  
 
Door- 50  
30 meter roll of cable 2.5 mm - 32
+
50 meter roll of cable 2.5 mm - 32
 
Sockets 13A 2-Gang Single Pole Switch Socket Metal-Clad 4 - 20 pounds
 
Sockets 13A 2-Gang Single Pole Switch Socket Metal-Clad 4 - 20 pounds
 
Sink - 100  
 
Sink - 100  

Revision as of 17:25, 9 May 2014


We've planning to build a darkroom for the new space since we got in. After months of chatting and estimating what is needed we have a dealine for building this up and its on the next Open Day 1st June. The room will be a multi-purpose darkroom. We are willing to develop and create experiments with film and screenprint among any other ideas!

Pledge opened: Not yet open

Pledge leader: Blanca or Paddy Ruben (wyan)

Budget estimation

Wall- (plasterboard 14 sheets- Pounds + 70 andSTRUCTURE CLS 21 -105 ) 175 pounds Plumbing - 30 pounds Screws- 10 pounds Bonding grue : 10 pounds Blackout fabric - 30 Door- 50 50 meter roll of cable 2.5 mm - 32 Sockets 13A 2-Gang Single Pole Switch Socket Metal-Clad 4 - 20 pounds Sink - 100 TOTAL - 457 pounds


Pledges

Running total: '0

Approximate target: £457