Cremer st - Infrastructure: Difference between revisions
From London Hackspace Wiki
Cremer st - Infrastructure (view source)
Revision as of 23:16, 15 September 2011
, 15 September 2011no edit summary
No edit summary |
No edit summary |
||
| Line 24: | Line 24: | ||
=== Kitchen Wiring === | === Kitchen Wiring === | ||
* Description: wiring for oven | * Description: wiring for oven anoff M12 full nuts | ||
4 off M12 flat washers (on site) | |||
4 off M10 studding 350mm d hob. Needs to be certified by an electrician. | |||
* Status: | * Status: | ||
* People: Russ | * People: Russ | ||
| Line 38: | Line 40: | ||
* Description: [[Darkroom]] | * Description: [[Darkroom]] | ||
* Status: started building some work surfaces, Supports part finished. | * Status: started building some work surfaces, Supports part finished. | ||
Update 15SEP11 | |||
Right hand (Enlarger) bench finished. Supports for others finished. | |||
Final dimensions of other benches to be finalised in conjunction with other interested parties. | |||
* People: Phil, AlexP | * People: Phil, AlexP | ||
| Line 60: | Line 68: | ||
* Requirements : <s>epoxy capsules (I have some of these, possibly date-expired - artag), studding, large masonry drill bit, heavy duty power drill. I also have the latter 2, but can't bring them to the space cleaning day. It may be possible to do the drilling phase before that date.</s> | * Requirements : <s>epoxy capsules (I have some of these, possibly date-expired - artag), studding, large masonry drill bit, heavy duty power drill. I also have the latter 2, but can't bring them to the space cleaning day. It may be possible to do the drilling phase before that date.</s> | ||
Update | Update 15SEP11 | ||
* Progress: Bolts now fixed into ceiling, Mounting plates made and ready. | * Progress: Bolts now fixed into ceiling, Mounting plates made and ready. | ||
* Further requirements: Due to revised mounting method more materials as below | * Further requirements: Due to revised mounting method more materials as below | ||
**12 off M10 full nuts | |||
**12 off M10 flat washers | |||
** | |||
** | |||
**4 off strong hackers to lift screen into place | **4 off strong hackers to lift screen into place | ||
**2 off weak hackers to fit the nuts | **2 off weak hackers to fit the nuts | ||