Anonymous

Pledge: Bike Chain: Difference between revisions

From London Hackspace Wiki
fix typo
(update)
(fix typo)
Line 3: Line 3:
This pledge has been dormant for a while so an alternative plan <del>is in the works but is currently on hold while the walkway is being resurfaced.</del> <del>not progressing due to nobody being bothered about it</del> <del>installed! (last time I looked).</del>  
This pledge has been dormant for a while so an alternative plan <del>is in the works but is currently on hold while the walkway is being resurfaced.</del> <del>not progressing due to nobody being bothered about it</del> <del>installed! (last time I looked).</del>  


The landlord complained about stuff on the balconys, everything including antennas, wind turbines, junk and teh bike pole has been removed.
The landlord complained about stuff on the balconys, everything including antennas, wind turbines, junk and the bike pole has been removed.


Lengths of hefty chain from a wheel clamp have been welded to a bit of scaffolding pole and locked to the walkway with high security padlocks.
Lengths of hefty chain from a wheel clamp have been welded to a bit of scaffolding pole and locked to the walkway with high security padlocks.
Line 9: Line 9:
It takes a few minutes with an angle grinder to cut the chain or the pole which seems reasonably secure. Someone in the space will probably notice the noise.
It takes a few minutes with an angle grinder to cut the chain or the pole which seems reasonably secure. Someone in the space will probably notice the noise.


There was some mention of a representative of the landlord being grumpy about bike storage. Someone on the list said they were waiting for clarification in november 2011, no updates that I'v noticed.
There was some mention of a representative of the landlord being grumpy about bike storage. Someone on the list said they were waiting for clarification in November 2011, no updates that I'v noticed.


It could be painted light green to match the balustrade if anyone can be bothered (estimate completion date 2022).
It could be painted light green to match the balustrade if anyone can be bothered (estimate completion date 2022).
255

edits