Anonymous

Equipment/PCB etch station: Difference between revisions

From London Hackspace Wiki
Line 98: Line 98:


A new configuration places a T joint near the pump with the clamp fitted to the additional open outlet. The idea is to make a controlled leak so that excess pressure is bled off rather than overpressurising the joints. It's likely that this will need to be adjusted as the bubbler silts up.
A new configuration places a T joint near the pump with the clamp fitted to the additional open outlet. The idea is to make a controlled leak so that excess pressure is bled off rather than overpressurising the joints. It's likely that this will need to be adjusted as the bubbler silts up.
The low-volume pump used for aeration is now teed into the bubbler pipe, so it will either bubble slowly from that or fast from the big pump. I had to add another non-return valve so the aerator air didn't all leak out the restricted leak. { diagram needed }


==Instructions==
==Instructions==