1,496
edits
mNo edit summary |
|||
Line 1: | Line 1: | ||
== General progress == | == General progress == | ||
[[Hackspace_Move]] | Documentation: [[Hackspace_Move]] | ||
Infrastructure preparations are in full progress. At the moment we are mostly interested in skilled workers (carpentry, electrics, plumbing; but also drivers with vehicles), don't need many unskilled volunteers. | Infrastructure preparations are in full progress. At the moment we are mostly interested in skilled workers (carpentry, electrics, plumbing; but also drivers with vehicles), don't need many unskilled volunteers. | ||
Line 11: | Line 11: | ||
== Pre-move move == | == Pre-move move == | ||
[[Hackspace_Move/Pre_Move_Move]] | Documentation: [[Hackspace_Move/Pre_Move_Move]] | ||
Lots of stuff was moved, but: people got a little over-excited and didn't always stick to the wiki plan. Some stuff got moved that shouldn't have (e.g. laptops), whereas other things were left behind (e.g. pile of servers/network/comms kit.) And: things were left in random locations and needed to be moved around the next day by Paddy and others. | Lots of stuff was moved, but: people got a little over-excited and didn't always stick to the wiki plan. Some stuff got moved that shouldn't have (e.g. laptops), whereas other things were left behind (e.g. pile of servers/network/comms kit.) And: things were left in random locations and needed to be moved around the next day by Paddy and others. | ||
Line 20: | Line 20: | ||
== Walls == | == Walls == | ||
Documentation: TODO | |||
The old office/counter on the ground floor was demolished. We received a first delivery: plasterboard, rock wool, etc. Tomorrow we're expecting 2x4s so we can build it, delivery time 8-11am. | The old office/counter on the ground floor was demolished. We received a first delivery: plasterboard, rock wool, etc. Tomorrow we're expecting 2x4s so we can build it, delivery time 8-11am. | ||
Line 33: | Line 35: | ||
== Lift == | == Lift == | ||
[[447_Hackney_Road/Lift]] | Documentation: [[447_Hackney_Road/Lift]] | ||
The lift is leaking. Tgreer cleaned up the mechanism, took readings, and replaced the bucket; he'll monitor it over the next few days. | The lift is leaking. Tgreer cleaned up the mechanism, took readings, and replaced the bucket; he'll monitor it over the next few days. | ||
Line 40: | Line 42: | ||
== Power == | == Power == | ||
Documentation: TODO | |||
We have a layout for electrical conduits. (AlisonW will send a longer update soon.) | We have a layout for electrical conduits. (AlisonW will send a longer update soon.) | ||
== Workshop == | == Workshop == | ||
Documentation: TODO | |||
The floor has mostly been stripped, we picked out panels we can reuse, the rest is stacked in the car park. There's an ongoing discussion whether we want to paint the cement floor. It may be too expensive, but without doing so there might be a dust issue. | The floor has mostly been stripped, we picked out panels we can reuse, the rest is stacked in the car park. There's an ongoing discussion whether we want to paint the cement floor. It may be too expensive, but without doing so there might be a dust issue. | ||
Line 49: | Line 55: | ||
== Comms == | == Comms == | ||
[[447_Hackney_Road/Networking]] | Documentation: [[447_Hackney_Road/Networking]] | ||
Internet was ordered. The phone Line should go in on Wednesday. We're Getting 80/20 FTTC from Zen with a 1000Gb download limit - As always please use the internet in the space sensibly | Internet was ordered. The phone Line should go in on Wednesday. We're Getting 80/20 FTTC from Zen with a 1000Gb download limit - As always please use the internet in the space sensibly | ||
Line 57: | Line 63: | ||
== Door access == | == Door access == | ||
[[447_Hackney_Road/Doorbot]] | Documentation: [[447_Hackney_Road/Doorbot]] | ||
Doorbot was set up for some key people (infrastructure coordinators, trustees.) If you need access too, just ask. Some more work to do over the next days, including fixing a problem where the door doesn't close. | Doorbot was set up for some key people (infrastructure coordinators, trustees.) If you need access too, just ask. Some more work to do over the next days, including fixing a problem where the door doesn't close. | ||
Line 63: | Line 69: | ||
== Fire Safety == | == Fire Safety == | ||
[[447_Hackney_Road/Fire_Safety]] | Documentation: [[447_Hackney_Road/Fire_Safety]] | ||
There will be three emergency exits, one of which serves both ground floor and basement. | There will be three emergency exits, one of which serves both ground floor and basement. | ||
Line 69: | Line 75: | ||
== Waste == | == Waste == | ||
[[447_Hackney_Road/Rubbish]] | Documentation: [[447_Hackney_Road/Rubbish]] | ||
We're chasing quotes. | We're chasing quotes. |