Power/works list: Difference between revisions

From London Hackspace Wiki
Line 24: Line 24:
===Sub-distro boxes===
===Sub-distro boxes===
* <s>One to be fitted on outside wall of office, marked [CU]</s>
* <s>One to be fitted on outside wall of office, marked [CU]</s>
* <s>One to be fitted on outer wall of wet lab/biolab, marked [CU]</s>
* <s>One to be fitted on outer wall of wet lab/biolab, marked [CU]
** Use 2.5mm T+E from this box to service horizontal line of sockets in biolab at approx 1m height from floor and 24cm spacing
** Use 2.5mm T+E from this box to service horizontal line of sockets in biolab at approx 1m height from floor and 24cm spacing
*** Metalclad sockets to suit are already separated for installation in the blue bags in the electrics tray
*** Metalclad sockets to suit are already separated for installation in the blue bags in the electrics tray
*** Fit female conduit ends to back boxes before installation, cut 8x 24cm lengths of conduit and build socket line on floor. Hold to wall to mark screw positions. Drill and fit.
*** Fit female conduit ends to back boxes before installation, cut 8x 24cm lengths of conduit and build socket line on floor. Hold to wall to mark screw positions. Drill and fit.
*** Ring should be wired on alternate boxes for preference. Ensure earth sleeving is used, especially on short earth leads to boxes.
*** Ring should be wired on alternate boxes for preference. Ensure earth sleeving is used, especially on short earth leads to boxes.</s>