Anonymous

Power/works list: Difference between revisions

From London Hackspace Wiki
Line 16: Line 16:
** <s>feed 10/3 swa through this hole *from downstairs* and pull through, first through a new hole on ground floor to be drilled just above the riser's cover.</s>
** <s>feed 10/3 swa through this hole *from downstairs* and pull through, first through a new hole on ground floor to be drilled just above the riser's cover.</s>
** <s>Then cleat up and over the corridor until it reaches the sub-box already attached on the outer wall of the classroom. Cable should reach to bottom of box.</s>
** <s>Then cleat up and over the corridor until it reaches the sub-box already attached on the outer wall of the classroom. Cable should reach to bottom of box.</s>
** <s>once upstairs is fitted, downstairs pay out cable and lay along cable tray until new distro box is reached - </s>
** <s>once upstairs is fitted, downstairs pay out cable and lay along cable tray until new distro box is reached -  
*** cable fixes via trunking, cut for length though to equal *bottom* of new distro box
*** cable fixes via trunking, cut for length though to equal *bottom* of new distro box</s>
* <s>Re-use 16/3 swa cable from upstairs to reach from new distro box (bottom of) to whichever workshop it will reach to</s>
* <s>Re-use 16/3 swa cable from upstairs to reach from new distro box (bottom of) to whichever workshop it will reach to</s>
** <s>Install new 16/3 swa cable to other sub-box locations in basement (1 fewer then general workshop, wood, metal, bio-wet</s>)
** <s>Install new 16/3 swa cable to other sub-box locations in basement (1 fewer then general workshop, wood, metal, bio-wet</s>)