Pledge: Basement plumbing: Difference between revisions

From London Hackspace Wiki

no edit summary
mNo edit summary
No edit summary
Line 6: Line 6:


==The items==
==The items==
* A pump to push waste water upstairs to main drain pipe. Inflow and drainage pipes.
* A pump to push waste water upstairs to main drain pipe.
* Inflow and drainage pipes.
 
==We should then have==
 
* Sink in the main workshop area with HOT WATER!
* 1 Sink in PCB/darkroom area
* working PCB etching tank
* Sink in the Biolab
 
 


===Budget estimation===
===Budget estimation===
* £800. £590 for pump, rest on pipes.  
* £800. (£590 for pump, rest on pipes. )


==Pledges==
==Pledges==