760
edits
mNo edit summary |
No edit summary |
||
Line 6: | Line 6: | ||
==The items== | ==The items== | ||
* A pump to push waste water upstairs to main drain pipe. Inflow and drainage pipes. | * A pump to push waste water upstairs to main drain pipe. | ||
* Inflow and drainage pipes. | |||
==We should then have== | |||
* Sink in the main workshop area with HOT WATER! | |||
* 1 Sink in PCB/darkroom area | |||
* working PCB etching tank | |||
* Sink in the Biolab | |||
===Budget estimation=== | ===Budget estimation=== | ||
* £800. £590 for pump, rest on pipes. | * £800. (£590 for pump, rest on pipes. ) | ||
==Pledges== | ==Pledges== |