Anonymous

Laboratory 24/Network: Difference between revisions

From London Hackspace Wiki
Line 91: Line 91:


We also have 2 small unmanaged switches, one is under the laser cutter for coolbot and layz0rs, and one is by the smaller touchtable and was used for the stratasys. Both should be replaceable (or almost replaceable) by the new cabling.
We also have 2 small unmanaged switches, one is under the laser cutter for coolbot and layz0rs, and one is by the smaller touchtable and was used for the stratasys. Both should be replaceable (or almost replaceable) by the new cabling.
We also have 2 more Cisco switches, a 3560 Poe-24 (24 port + 2 x gigabit sfp's) and a 2550 (24 port, 2 x gigabit gbics). We have copper SFP's but the copper gbics we've got don't fit in the switch!, see [[cisco3]] & [[cisco4]]. We have fibre sfp's and some bits of fibre instead.


== Servers ==
== Servers ==