'''4. Materials''' | '''4. Materials''' | ||
The autoclave requires a supply of RO water. If the water supply level falls below a minimum level, the operator will be required to top up the system. The RO water is available from the tank under the counter. The autoclave is filled into the tank from the top of the machine. | The autoclave requires a supply of '''RO water'''. If the water supply level falls below a minimum level, the operator will be required to top up the system. The RO water is available from the tank under the counter. The autoclave is filled into the tank from the top of the machine. | ||
The daily test, and waste deactivation runs of the autoclave require autoclave tape. If we are out of autoclave tape, please email the [mailti:hello@biohackspace.org BSO] and report that we are out of stock. | The daily test, and waste deactivation runs of the autoclave require '''autoclave tape'''. If we are out of autoclave tape, please email the [mailti:hello@biohackspace.org BSO] and report that we are out of stock. | ||
| Line 55: | Line 55: | ||
The test strip should be stapled into the lab book, with a note indicating the operator and the date/time the test was run, along with any observations. | The test strip should be stapled into the lab book, with a note indicating the operator and the date/time the test was run, along with any observations. | ||
7.1.1 | 7.1.1 Sterilize the load using the Universal Programme (28 psi/134 C/30 mins) | ||