Anonymous

Equipment/Stratasys FDM 1650: Difference between revisions

From London Hackspace Wiki
Line 81: Line 81:
*6. <s>Head end redesign complete, waiting for aluminium part for mounting hot-ends</s>
*6. <s>Head end redesign complete, waiting for aluminium part for mounting hot-ends</s>
*7. <s>Filament path checks.</s>
*7. <s>Filament path checks.</s>
*8. Install Raspberry Pi with Octoprint.
*8. Install Raspberry Pi with Octoprint and touch-screen.
*9. Dual head calibration test print.
*9. Dual head calibration test print.
*10. Heated chamber (required for ABS), phase 2.
*10. Heated chamber (required for ABS), phase 2.