447 Networking: Difference between revisions

From London Hackspace Wiki
1,386 bytes removed ,  2 July 2015
Tidy up
(update with new panel and ports.)
(Tidy up)
Line 99: Line 99:
* 15 - 16 left of roller door
* 15 - 16 left of roller door
* 17 - 18 rear wall of lobby
* 17 - 18 rear wall of lobby
* 19 - 20 '''Basement''' on far wall near hose reel and phone dist boards. '''Basement'''
* 21 - 22 '''Basement''' on wall on outside of lift plant room in metal workshop '''Basement'''
* 23 - 24 '''Basement''' biohack lab on far wall. '''Basement'''
* 25 - 26 '''Basement''' near fire hose pumps hidden behind the storage shelves '''Basement'''
* 27 - 28 office under cab
* 27 - 28 office under cab
* 29 - office under cab
* 29 - office under cab
Line 182: Line 186:
#
#
#
#
==== To be added ====
===== Quiet Room =====
* <s>1 x double socket and a quad - maybe not if we put shelving up.</s> no.
===== South Wall Outside the Classroom =====
* <s>quad socket by tesla</s>
* <s>quad socket by the table next to tesla</s>
Both above serve tesla + babbage + printers + other bits
* <s>dual socket on the east side of the electronics bench</s>
* <s>and another on the west side</s> - we didn't bother with another one.
* <s>dual socket somewhere by the door for future doorbot + other bits <- maybe a quad here?</s> we did put a quad there.
All the above to go over new trunking, 14 cables.
===== Classroom =====
* <s>sockets on north and west walls</s> done!
* <s>East wall: 4 x double socket</s> - didn't bother in the end
* <s>South wall 3 double sockets</s> - didn't bother in the end
all 7 double sockets above to be fed from the trunking on the south side of the horizontal pillar thing along the ceiling == 14 cables, maybe too much to fit?
=== Basement ===
* 19 - 20 on far wall near hose reel and phone dist boards.
* 21 - 22 on wall on outside of lift plant room
* 23 - 24 biohack basement on far wall.
* 25 - 26 near fire hose pumps hidden behind the desk/counter
==== To be added ====
* <s>1 x double socket near biohackers door for ac node/doorbot</s>
* 2 x double socket in each workshop for acnode
* 4 x double socket in CNC area (plz ta - artag)
* ?
=== Total new sockets on the ground floor cabinet ===
4 between ground and basement
14 in the classroom
14 along south wall
--
32
= 28 new ports needed (4 spare on the existing panels).
_or_
5 doubles in the classroom
1 quad by tesla and babbage
1 double by tesla and babbage
1 quad by the door?
= 20
+ 4 to the basement.


[[Category:Premises]]