| Line 99: |
Line 99: |
| * 15 - 16 left of roller door | | * 15 - 16 left of roller door |
| * 17 - 18 rear wall of lobby | | * 17 - 18 rear wall of lobby |
| | * 19 - 20 '''Basement''' on far wall near hose reel and phone dist boards. '''Basement''' |
| | * 21 - 22 '''Basement''' on wall on outside of lift plant room in metal workshop '''Basement''' |
| | * 23 - 24 '''Basement''' biohack lab on far wall. '''Basement''' |
| | * 25 - 26 '''Basement''' near fire hose pumps hidden behind the storage shelves '''Basement''' |
| * 27 - 28 office under cab | | * 27 - 28 office under cab |
| * 29 - office under cab | | * 29 - office under cab |
| Line 182: |
Line 186: |
| # | | # |
| # | | # |
|
| |
|
| |
| ==== To be added ====
| |
|
| |
| ===== Quiet Room =====
| |
|
| |
| * <s>1 x double socket and a quad - maybe not if we put shelving up.</s> no.
| |
|
| |
| ===== South Wall Outside the Classroom =====
| |
|
| |
| * <s>quad socket by tesla</s>
| |
| * <s>quad socket by the table next to tesla</s>
| |
|
| |
| Both above serve tesla + babbage + printers + other bits
| |
|
| |
| * <s>dual socket on the east side of the electronics bench</s>
| |
| * <s>and another on the west side</s> - we didn't bother with another one.
| |
|
| |
| * <s>dual socket somewhere by the door for future doorbot + other bits <- maybe a quad here?</s> we did put a quad there.
| |
|
| |
| All the above to go over new trunking, 14 cables.
| |
|
| |
| ===== Classroom =====
| |
|
| |
| * <s>sockets on north and west walls</s> done!
| |
| * <s>East wall: 4 x double socket</s> - didn't bother in the end
| |
| * <s>South wall 3 double sockets</s> - didn't bother in the end
| |
|
| |
| all 7 double sockets above to be fed from the trunking on the south side of the horizontal pillar thing along the ceiling == 14 cables, maybe too much to fit?
| |
|
| |
| === Basement ===
| |
|
| |
| * 19 - 20 on far wall near hose reel and phone dist boards.
| |
| * 21 - 22 on wall on outside of lift plant room
| |
| * 23 - 24 biohack basement on far wall.
| |
| * 25 - 26 near fire hose pumps hidden behind the desk/counter
| |
|
| |
| ==== To be added ====
| |
|
| |
| * <s>1 x double socket near biohackers door for ac node/doorbot</s>
| |
| * 2 x double socket in each workshop for acnode
| |
| * 4 x double socket in CNC area (plz ta - artag)
| |
| * ?
| |
|
| |
| === Total new sockets on the ground floor cabinet ===
| |
|
| |
| 4 between ground and basement
| |
| 14 in the classroom
| |
| 14 along south wall
| |
| --
| |
| 32
| |
|
| |
| = 28 new ports needed (4 spare on the existing panels).
| |
|
| |
| _or_
| |
|
| |
| 5 doubles in the classroom
| |
| 1 quad by tesla and babbage
| |
| 1 double by tesla and babbage
| |
| 1 quad by the door?
| |
|
| |
| = 20
| |
| + 4 to the basement.
| |
|
| |
|
| [[Category:Premises]] | | [[Category:Premises]] |
| [[Category:Infrastructure]] | | [[Category:Infrastructure]] |