Anonymous

Door control system/Logbook: Difference between revisions

From London Hackspace Wiki
1st floor doorbot replaced PSU
(→‎2015-8-5: PS replaced.)
(1st floor doorbot replaced PSU)
Line 1: Line 1:
All changes/problems reported with the door entry system.
All changes/problems reported with the door entry system.
See also http://github.com/londonhackspace/Doorbot/commits/master and https://github.com/londonhackspace/Doorbot/issues/
See also http://github.com/londonhackspace/Doorbot/commits/master and https://github.com/londonhackspace/Doorbot/issues/
==2018-11-03==
1st Floor doorbot reset itself. On investigating, it was found that the regulator on the PSU was overheating. even when loaded within limits, resulting in a serious undervoltage. The only thing that was keeping the doorbot working was the SLA 12V battery. PSU was replaced with a switched-mode PSU that we found that should be capable of 3A at 12V. New PSU runs a lot cooler.
Software update applied to 1st floor doorbot and back doorbot.
Doorbell button implemented.


==2015-8-5==
==2015-8-5==
538

edits