==2018-11-03== | |||
1st Floor doorbot reset itself. On investigating, it was found that the regulator on the PSU was overheating. even when loaded within limits, resulting in a serious undervoltage. The only thing that was keeping the doorbot working was the SLA 12V battery. PSU was replaced with a switched-mode PSU that we found that should be capable of 3A at 12V. New PSU runs a lot cooler. | |||
Software update applied to 1st floor doorbot and back doorbot. | |||
Doorbell button implemented. | |||